Newman / CT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)85 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ad7ed73e42d3ac6a5318d825
Net Summer Capacity (MW)64 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ad7ed73e42d3ac6a5318d825
Net Winter Capacity (MW)71 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ad7ed73e42d3ac6a5318d825
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID3456
Plant NameNewman
Google MapMap
Bing MapMap
Plant StateTX
CountyEl Paso
Balancing Authority CodeEPE
SectorElectric Utility
Generator IDCT1
Unit Code4CC
Nameplate Capacity (MW)85
Net Summer Capacity (MW)64
Net Winter Capacity (MW)71
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Status(OP) Operating
Latitude31.983587
Longitude-106.4318
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4959

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4954

Sources EV-dd45d9169753f1eac43aad44
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f3bef2e5628c18d45d24c462a7f03d453e3f6062e251861e76dcb234a275e3a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4959

Sources EV-ad7ed73e42d3ac6a5318d825
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6306eab8b9158f66498dbe1a35e1b1594e1cc9970d95a7c95ef10428197adcc3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Newman / CT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID3456
Plant NameNewman
Google MapMap
Bing MapMap
Plant StateTX
CountyEl Paso
Balancing Authority CodeEPE
SectorElectric Utility
Generator IDCT1
Unit Code4CC
Nameplate Capacity (MW)85
Net Summer Capacity (MW)64
Net Winter Capacity (MW)71
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Status(OP) Operating
Latitude31.983587
Longitude-106.4318
Original text(OP) Operating
source_record_idOperating:4959

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4959

Sources EV-ad7ed73e42d3ac6a5318d825
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6306eab8b9158f66498dbe1a35e1b1594e1cc9970d95a7c95ef10428197adcc3

Usage terms US government public domain

Source snapshots by date · USA · eia860

Newman / CT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5701
Utility NameEl Paso Electric Co
Plant Code3456
Plant NameNewman
StateTX
CountyEl Paso
Generator IDCT1
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit Code4CC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)85
Nameplate Power Factor0.9
Summer Capacity (MW)64
Winter Capacity (MW)71
Minimum Load (MW)29
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4954

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4954

Sources EV-dd45d9169753f1eac43aad44
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f3bef2e5628c18d45d24c462a7f03d453e3f6062e251861e76dcb234a275e3a

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel