Power assets and projects · USA · eia860m

Newman / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)120 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89c15d3aca47b4cb8d5ad6fe
Net Summer Capacity (MW)86 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89c15d3aca47b4cb8d5ad6fe
Net Winter Capacity (MW)90 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89c15d3aca47b4cb8d5ad6fe
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID3456
Plant NameNewman
Google MapMap
Bing MapMap
Plant StateTX
CountyEl Paso
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID4
Unit Code4CC
Nameplate Capacity (MW)120
Net Summer Capacity (MW)86
Net Winter Capacity (MW)90
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Status(OP) Operating
Latitude31.983587
Longitude-106.4318
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4954

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4949

Sources EV-3ce0044b4bf342233ca3f582
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18ea2a0a9931f7a10eff5d2805b346cd0db60b5eed739d5ad50e6e7aaf7b3d7e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4954

Sources EV-89c15d3aca47b4cb8d5ad6fe
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3e3de810b07da842ce4d55e4d2a3046c5633e679bc60a908c1c511a32aa9d167

Usage terms US government public domain

Source snapshots by date · USA · eia860

Newman / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5701
Utility NameEl Paso Electric Co
Plant Code3456
Plant NameNewman
StateTX
CountyEl Paso
Generator ID4
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCA
Unit Code4CC
OwnershipS
Duct BurnersY
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)120
Nameplate Power Factor0.9
Summer Capacity (MW)86
Winter Capacity (MW)90
Minimum Load (MW)24
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4949

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4949

Sources EV-3ce0044b4bf342233ca3f582
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18ea2a0a9931f7a10eff5d2805b346cd0db60b5eed739d5ad50e6e7aaf7b3d7e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Newman / 4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID3456
Plant NameNewman
Google MapMap
Bing MapMap
Plant StateTX
CountyEl Paso
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID4
Unit Code4CC
Nameplate Capacity (MW)120
Net Summer Capacity (MW)86
Net Winter Capacity (MW)90
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month8
Operating Year1975
Planned Retirement Month12
Planned Retirement Year2031
Status(OP) Operating
Latitude31.983587
Longitude-106.4318
Original text(OP) Operating
source_record_idOperating:4954

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4954

Sources EV-89c15d3aca47b4cb8d5ad6fe
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3e3de810b07da842ce4d55e4d2a3046c5633e679bc60a908c1c511a32aa9d167

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel