POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Johnsonville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)172.8 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-7df70fc9d7f0a426df8fa00e
Net Summer Capacity (MW)141 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-7df70fc9d7f0a426df8fa00e
Net Winter Capacity (MW)144 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-7df70fc9d7f0a426df8fa00e
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)172.8
Net Summer Capacity (MW)141
Net Winter Capacity (MW)144
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month1
Operating Year1959
Retirement Month12
Retirement Year2015
Latitude36.0278
Longitude-87.9861
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:3285

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2123

Sources EV-44441858fb3bb516427f2552
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 44e4765254143f8f0ee81cec170e8ab911ffb67b212783b69a5851204c2dedc8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:3285

Sources EV-7df70fc9d7f0a426df8fa00e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 908b14b85a4a0c07ed8e753b5dd69cc5b0471eea259b06dc4815627a926a2e21

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Johnsonville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)172.8
Net Summer Capacity (MW)141
Net Winter Capacity (MW)144
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month1
Operating Year1959
Retirement Month12
Retirement Year2015
Latitude36.0278
Longitude-87.9861
Original textRetired
source_record_idRetired:3285

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:3285

Sources EV-7df70fc9d7f0a426df8fa00e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 908b14b85a4a0c07ed8e753b5dd69cc5b0471eea259b06dc4815627a926a2e21

Usage terms US government public domain

Source snapshots by date · USA · eia860

Johnsonville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3406
Plant NameJohnsonville
StateTN
CountyHumphreys
Generator ID8
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)172.8
Nameplate Power Factor0.9
Summer Capacity (MW)141
Winter Capacity (MW)144
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month1
Operating Year1959
Retirement Month12
Retirement Year2015
Associated with Combined Heat and Power SystemY
Sector NameElectric Utility
Sector1
Topping or BottomingT
Energy Source 1SUB
Energy Source 2BIT
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Multiple Fuels?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:2123

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2123

Sources EV-44441858fb3bb516427f2552
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 44e4765254143f8f0ee81cec170e8ab911ffb67b212783b69a5851204c2dedc8

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel