POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Johnsonville / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)147 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-9ef55247115e8424745c1e1a
Net Summer Capacity (MW)107 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-9ef55247115e8424745c1e1a
Net Winter Capacity (MW)113 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-9ef55247115e8424745c1e1a
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)147
Net Summer Capacity (MW)107
Net Winter Capacity (MW)113
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month11
Operating Year1952
Retirement Month12
Retirement Year2015
Latitude36.0278
Longitude-87.9861
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:3282

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2120

Sources EV-81f44b85c98d02c25fc7460a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ad7b45a3bd3bf6c490f2cc7e7a1bdb2545e93e95b4964957911828284f44ef3e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:3282

Sources EV-9ef55247115e8424745c1e1a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5a4f7c2d85f8bb4738e633e14146c1e0528cb9d89d1af24ad288514457a5945e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Johnsonville / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3406
Plant NameJohnsonville
StateTN
CountyHumphreys
Generator ID5
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)147
Nameplate Power Factor0.9
Summer Capacity (MW)107
Winter Capacity (MW)113
Minimum Load (MW)58
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month11
Operating Year1952
Retirement Month12
Retirement Year2015
Associated with Combined Heat and Power SystemY
Sector NameElectric Utility
Sector1
Topping or BottomingT
Energy Source 1SUB
Energy Source 2BIT
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Multiple Fuels?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:2120

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2120

Sources EV-81f44b85c98d02c25fc7460a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ad7b45a3bd3bf6c490f2cc7e7a1bdb2545e93e95b4964957911828284f44ef3e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Johnsonville / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)147
Net Summer Capacity (MW)107
Net Winter Capacity (MW)113
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month11
Operating Year1952
Retirement Month12
Retirement Year2015
Latitude36.0278
Longitude-87.9861
Original textRetired
source_record_idRetired:3282

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:3282

Sources EV-9ef55247115e8424745c1e1a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5a4f7c2d85f8bb4738e633e14146c1e0528cb9d89d1af24ad288514457a5945e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel