Power assets and projects · USA · eia860m

Johnsonville / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)125 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-63626d7447778c9614d57fa3
Net Summer Capacity (MW)107 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-63626d7447778c9614d57fa3
Net Winter Capacity (MW)113 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-63626d7447778c9614d57fa3
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)125
Net Summer Capacity (MW)107
Net Winter Capacity (MW)113
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month10
Operating Year1951
Retirement Month12
Retirement Year2017
Latitude36.0278
Longitude-87.9861
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2666

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2115

Sources EV-389407133383f2dac765175f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0218798644552c86bf54c8da65a2b297fefb84b35fa8b5753c2e098cecc6e9a2

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2666

Sources EV-63626d7447778c9614d57fa3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3c22cc2d6259dfa074acf2bc398afd2b7bfe7af53a2aab8518d01a9deaf6bb51

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Johnsonville / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3406
Plant NameJohnsonville
Google MapMap
Bing MapMap
Plant StateTN
CountyHumphreys
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)125
Net Summer Capacity (MW)107
Net Winter Capacity (MW)113
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month10
Operating Year1951
Retirement Month12
Retirement Year2017
Latitude36.0278
Longitude-87.9861
Original textRetired
source_record_idRetired:2666

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2666

Sources EV-63626d7447778c9614d57fa3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3c22cc2d6259dfa074acf2bc398afd2b7bfe7af53a2aab8518d01a9deaf6bb51

Usage terms US government public domain

Source snapshots by date · USA · eia860

Johnsonville / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3406
Plant NameJohnsonville
StateTN
CountyHumphreys
Generator ID1
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)125
Nameplate Power Factor0.9
Summer Capacity (MW)107
Winter Capacity (MW)113
Minimum Load (MW)60
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month10
Operating Year1951
Retirement Month12
Retirement Year2017
Associated with Combined Heat and Power SystemY
Sector NameElectric Utility
Sector1
Topping or BottomingT
Energy Source 1SUB
Energy Source 2DFO
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Multiple Fuels?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:2115

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2115

Sources EV-389407133383f2dac765175f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0218798644552c86bf54c8da65a2b297fefb84b35fa8b5753c2e098cecc6e9a2

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel