Douglas Dam / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)41.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bb56e86ad45ed52b9221f7d9
Net Summer Capacity (MW)44.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bb56e86ad45ed52b9221f7d9
Net Winter Capacity (MW)27.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bb56e86ad45ed52b9221f7d9
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3400
Plant NameDouglas Dam
Google MapMap
Bing MapMap
Plant StateTN
CountySevier
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)41.4
Net Summer Capacity (MW)44.7
Net Winter Capacity (MW)27.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1949
Status(OP) Operating
Latitude35.9623
Longitude-83.5393
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4829

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4824

Sources EV-ce399ce21f1e1e6c45c696c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d8da245f5f8652d619618bdcd180bcf11f7da1375923f025f05f169d9b53182e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4829

Sources EV-bb56e86ad45ed52b9221f7d9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3ff439803c77ec91dac75ccfe5f72c2b7f3fc8dacf2225dae78d8f39d1180782

Usage terms US government public domain

Source snapshots by date · USA · eia860

Douglas Dam / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3400
Plant NameDouglas Dam
StateTN
CountySevier
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)41.4
Nameplate Power Factor0.9
Summer Capacity (MW)44.7
Winter Capacity (MW)27.5
Minimum Load (MW)13
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year1949
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4824

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4824

Sources EV-ce399ce21f1e1e6c45c696c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d8da245f5f8652d619618bdcd180bcf11f7da1375923f025f05f169d9b53182e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Douglas Dam / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID3400
Plant NameDouglas Dam
Google MapMap
Bing MapMap
Plant StateTN
CountySevier
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)41.4
Net Summer Capacity (MW)44.7
Net Winter Capacity (MW)27.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1949
Status(OP) Operating
Latitude35.9623
Longitude-83.5393
Original text(OP) Operating
source_record_idOperating:4829

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4829

Sources EV-bb56e86ad45ed52b9221f7d9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3ff439803c77ec91dac75ccfe5f72c2b7f3fc8dacf2225dae78d8f39d1180782

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel