Power assets and projects · USA · eia860m

99 Islands / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1802f782369011fc41110a03
Net Summer Capacity (MW)3.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1802f782369011fc41110a03
Net Winter Capacity (MW)3.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1802f782369011fc41110a03
Detailed source fields
Original source fieldPublished value or condition
Entity ID5416
Entity NameDuke Energy Carolinas, LLC
Plant ID3272
Plant Name99 Islands
Google MapMap
Bing MapMap
Plant StateSC
CountyCherokee
Balancing Authority CodeDUK
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3.4
Net Winter Capacity (MW)3.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1910
Status(OP) Operating
Latitude35.0314
Longitude-81.4936
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4698

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4693

Sources EV-b61cd5a713938ec067fc2047
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb7231f0e1b9a231489706891e51c6e0bfab1de0f191080d116afba941e12e5e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4698

Sources EV-1802f782369011fc41110a03
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4d7302a61e709ba8414559895d8ef618c509bca26a76bef84dd718e6b73e9bc3

Usage terms US government public domain

Source snapshots by date · USA · eia860

99 Islands / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5416
Utility NameDuke Energy Carolinas, LLC
Plant Code3272
Plant Name99 Islands
StateSC
CountyCherokee
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)3
Nameplate Power Factor1
Summer Capacity (MW)3.4
Winter Capacity (MW)3.4
Minimum Load (MW)3.4
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year1910
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4693

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4693

Sources EV-b61cd5a713938ec067fc2047
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb7231f0e1b9a231489706891e51c6e0bfab1de0f191080d116afba941e12e5e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

99 Islands / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5416
Entity NameDuke Energy Carolinas, LLC
Plant ID3272
Plant Name99 Islands
Google MapMap
Bing MapMap
Plant StateSC
CountyCherokee
Balancing Authority CodeDUK
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3.4
Net Winter Capacity (MW)3.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1910
Status(OP) Operating
Latitude35.0314
Longitude-81.4936
Original text(OP) Operating
source_record_idOperating:4698

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4698

Sources EV-1802f782369011fc41110a03
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4d7302a61e709ba8414559895d8ef618c509bca26a76bef84dd718e6b73e9bc3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel