AES Alamitos LLC / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)310 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bdb04bb3ac32bcc94940620a
Net Summer Capacity (MW)327 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bdb04bb3ac32bcc94940620a
Net Winter Capacity (MW)327 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bdb04bb3ac32bcc94940620a
Detailed source fields
Original source fieldPublished value or condition
Entity ID22148
Entity NameAES Alamitos LLC
Plant ID315
Plant NameAES Alamitos LLC
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator ID3
Nameplate Capacity (MW)310
Net Summer Capacity (MW)327
Net Winter Capacity (MW)327
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month12
Operating Year1961
Planned Retirement Month12
Planned Retirement Year2026
Status(OP) Operating
Latitude33.7688
Longitude-118.1009
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:544

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:542

Sources EV-3f8f78f846af8cbda25c30b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 aa88e047f14b25dc09e8fc784c4fafda9a305fd189537ac914d6b22108d9e778

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:544

Sources EV-bdb04bb3ac32bcc94940620a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a796fd85f5e8bab46c46d0419e3318f50d19993213478fa9846fb20c850e8caf

Usage terms US government public domain

Source snapshots by date · USA · eia860

AES Alamitos LLC / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID22148
Utility NameAES Alamitos LLC
Plant Code315
Plant NameAES Alamitos LLC
StateCA
CountyLos Angeles
Generator ID3
TechnologyNatural Gas Steam Turbine
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationALAMT3G_7_B1
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCALAMT3G_7_B1
Nameplate Capacity (MW)310
Nameplate Power Factor1
Summer Capacity (MW)327
Winter Capacity (MW)327
Minimum Load (MW)10
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year1961
Planned Retirement Month12
Planned Retirement Year2026
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1NG
Startup Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full LoadOVER
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:542

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:542

Sources EV-3f8f78f846af8cbda25c30b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 aa88e047f14b25dc09e8fc784c4fafda9a305fd189537ac914d6b22108d9e778

Usage terms US government public domain

Source snapshots by date · USA · eia860m

AES Alamitos LLC / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID22148
Entity NameAES Alamitos LLC
Plant ID315
Plant NameAES Alamitos LLC
Google MapMap
Bing MapMap
Plant StateCA
CountyLos Angeles
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator ID3
Nameplate Capacity (MW)310
Net Summer Capacity (MW)327
Net Winter Capacity (MW)327
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month12
Operating Year1961
Planned Retirement Month12
Planned Retirement Year2026
Status(OP) Operating
Latitude33.7688
Longitude-118.1009
Original text(OP) Operating
source_record_idOperating:544

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:544

Sources EV-bdb04bb3ac32bcc94940620a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a796fd85f5e8bab46c46d0419e3318f50d19993213478fa9846fb20c850e8caf

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel