Power assets and projects · USA · eia860m

Cougar / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)13 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-69fb15b182d5192e461e4952
Net Summer Capacity (MW)13 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-69fb15b182d5192e461e4952
Net Winter Capacity (MW)13 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-69fb15b182d5192e461e4952
Detailed source fields
Original source fieldPublished value or condition
Entity ID19400
Entity NameUSACE Northwestern Division
Plant ID3076
Plant NameCougar
Google MapMap
Bing MapMap
Plant StateOR
CountyLane
Balancing Authority CodeBPAT
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)13
Net Summer Capacity (MW)13
Net Winter Capacity (MW)13
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month4
Operating Year1964
Status(OP) Operating
Latitude44.1307
Longitude-122.2439
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4466

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4461

Sources EV-a2b80b156c6c270c75166eac
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b288fc2110c49c7df6af744aae5f6fbbd35cc1ed8bd6738bd26a3530bc6a1f3c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4466

Sources EV-69fb15b182d5192e461e4952
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4d8b83b28c73ab1d17640d7c554348c9124eb8614beb92b74664d54100429600

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cougar / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID19400
Utility NameUSACE Northwestern Division
Plant Code3076
Plant NameCougar
StateOR
CountyLane
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)13
Nameplate Power Factor0.95
Summer Capacity (MW)13
Winter Capacity (MW)13
Minimum Load (MW)12.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year1964
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4461

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4461

Sources EV-a2b80b156c6c270c75166eac
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b288fc2110c49c7df6af744aae5f6fbbd35cc1ed8bd6738bd26a3530bc6a1f3c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cougar / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID19400
Entity NameUSACE Northwestern Division
Plant ID3076
Plant NameCougar
Google MapMap
Bing MapMap
Plant StateOR
CountyLane
Balancing Authority CodeBPAT
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)13
Net Summer Capacity (MW)13
Net Winter Capacity (MW)13
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month4
Operating Year1964
Status(OP) Operating
Latitude44.1307
Longitude-122.2439
Original text(OP) Operating
source_record_idOperating:4466

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4466

Sources EV-69fb15b182d5192e461e4952
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4d8b83b28c73ab1d17640d7c554348c9124eb8614beb92b74664d54100429600

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel