POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Walters / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 36 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0a62099e6bcf5a72c8bfd4d2 Net Summer Capacity (MW) 36 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0a62099e6bcf5a72c8bfd4d2 Net Winter Capacity (MW) 36 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0a62099e6bcf5a72c8bfd4d2
Detailed source fields Original source field Published value or condition Entity ID 3046 Entity Name Duke Energy Progress - (NC) Plant ID 2715 Plant Name Walters Google Map Map Bing Map Map Plant State NC County Haywood Balancing Authority Code CPLE Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 36 Net Summer Capacity (MW) 36 Net Winter Capacity (MW) 36 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 7 Operating Year 1930 Status (OP) Operating Latitude 35.6946 Longitude -83.0503 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:4090
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4085
Sources EV-1dc80cd394caf8b64d432040 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 01f7d021a2154b164f59cd2c4a7780b0982d12c7c4e0f8c8e5b3665798f09936 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4090
Sources EV-0a62099e6bcf5a72c8bfd4d2 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 b419edf309ccd1db55b9570dcc7b7cba845987d2ae3dbcbfa0b4f8aa715b898d Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Walters / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 3046 Entity Name Duke Energy Progress - (NC) Plant ID 2715 Plant Name Walters Google Map Map Bing Map Map Plant State NC County Haywood Balancing Authority Code CPLE Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 36 Net Summer Capacity (MW) 36 Net Winter Capacity (MW) 36 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 7 Operating Year 1930 Status (OP) Operating Latitude 35.6946 Longitude -83.0503 Original text (OP) Operating source_record_id Operating:4090
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4090
Sources EV-0a62099e6bcf5a72c8bfd4d2 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 b419edf309ccd1db55b9570dcc7b7cba845987d2ae3dbcbfa0b4f8aa715b898d Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Walters / 1 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 3046 Utility Name Duke Energy Progress - (NC) Plant Code 2715 Plant Name Walters State NC County Haywood Generator ID 1 Technology Conventional Hydroelectric Prime Mover HY Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 36 Nameplate Power Factor 0.8 Summer Capacity (MW) 36 Winter Capacity (MW) 36 Minimum Load (MW) 36 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 7 Operating Year 1930 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Solid Fuel Gasification System? N Carbon Capture Technology? N Turbines or Hydrokinetic Buoys 0 Time from Cold Shutdown to Full Load 10M Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:4085
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4085
Sources EV-1dc80cd394caf8b64d432040 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 01f7d021a2154b164f59cd2c4a7780b0982d12c7c4e0f8c8e5b3665798f09936 Usage terms US government public domain
Observations for this power asset