POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Tillery / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)18 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a4d295c553dd670f92030cab
Net Summer Capacity (MW)18 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a4d295c553dd670f92030cab
Net Winter Capacity (MW)18 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a4d295c553dd670f92030cab
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID2714
Plant NameTillery
Google MapMap
Bing MapMap
Plant StateNC
CountyMontgomery
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)18
Net Summer Capacity (MW)18
Net Winter Capacity (MW)18
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month8
Operating Year1928
Status(OP) Operating
Latitude35.206741
Longitude-80.06483
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4087

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4082

Sources EV-fada62f2bdb33af013982ea2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 eb69f49fef330e8e4079fa1115c16c85e85c7805b1be995bfdce76d18e1d6e45

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4087

Sources EV-a4d295c553dd670f92030cab
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d98d30188941d194a346f9fc825239534c5db353d67327f6aac8ceb1d288d64

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Tillery / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID2714
Plant NameTillery
Google MapMap
Bing MapMap
Plant StateNC
CountyMontgomery
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)18
Net Summer Capacity (MW)18
Net Winter Capacity (MW)18
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month8
Operating Year1928
Status(OP) Operating
Latitude35.206741
Longitude-80.06483
Original text(OP) Operating
source_record_idOperating:4087

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4087

Sources EV-a4d295c553dd670f92030cab
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d98d30188941d194a346f9fc825239534c5db353d67327f6aac8ceb1d288d64

Usage terms US government public domain

Source snapshots by date · USA · eia860

Tillery / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code2714
Plant NameTillery
StateNC
CountyMontgomery
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)18
Nameplate Power Factor0.8
Summer Capacity (MW)18
Winter Capacity (MW)18
Minimum Load (MW)18
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month8
Operating Year1928
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4082

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4082

Sources EV-fada62f2bdb33af013982ea2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 eb69f49fef330e8e4079fa1115c16c85e85c7805b1be995bfdce76d18e1d6e45

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel