POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Asheville / GT2 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 211.8 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-23ffe2ff0cd4b58d929c1d68 Net Summer Capacity (MW) 160 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-23ffe2ff0cd4b58d929c1d68 Net Winter Capacity (MW) 185 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-23ffe2ff0cd4b58d929c1d68
Detailed source fields Original source field Published value or condition Entity ID 3046 Entity Name Duke Energy Progress - (NC) Plant ID 2706 Plant Name Asheville Google Map Map Bing Map Map Plant State NC County Buncombe Balancing Authority Code CPLE Sector Electric Utility Generator ID GT2 Nameplate Capacity (MW) 211.8 Net Summer Capacity (MW) 160 Net Winter Capacity (MW) 185 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Operating Month 6 Operating Year 2000 Status (OP) Operating Latitude 35.4731 Longitude -82.5417 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:4067
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4062
Sources EV-196fa7a6e2870b34a420d6a4 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 a22ae06f50761d777879ce2c950c1eb70e6abee85f2dcca27146683b53e7aafd Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4067
Sources EV-23ffe2ff0cd4b58d929c1d68 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 6de9fd106d2ee5843374926560a0de2f1344896a4256e5cfbb1f5b5480866c34 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Asheville / GT2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 3046 Entity Name Duke Energy Progress - (NC) Plant ID 2706 Plant Name Asheville Google Map Map Bing Map Map Plant State NC County Buncombe Balancing Authority Code CPLE Sector Electric Utility Generator ID GT2 Nameplate Capacity (MW) 211.8 Net Summer Capacity (MW) 160 Net Winter Capacity (MW) 185 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Operating Month 6 Operating Year 2000 Status (OP) Operating Latitude 35.4731 Longitude -82.5417 Original text (OP) Operating source_record_id Operating:4067
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4067
Sources EV-23ffe2ff0cd4b58d929c1d68 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 6de9fd106d2ee5843374926560a0de2f1344896a4256e5cfbb1f5b5480866c34 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Asheville / GT2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 3046 Utility Name Duke Energy Progress - (NC) Plant Code 2706 Plant Name Asheville State NC County Buncombe Generator ID GT2 Technology Natural Gas Fired Combustion Turbine Prime Mover GT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 211.8 Nameplate Power Factor 0.85 Summer Capacity (MW) 160 Winter Capacity (MW) 185 Minimum Load (MW) 70 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 6 Operating Year 2000 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 NG Energy Source 2 DFO Solid Fuel Gasification System? N Carbon Capture Technology? N Time from Cold Shutdown to Full Load 1H Multiple Fuels? Y Cofire Fuels? Y Switch Between Oil and Natural Gas? Y Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:4062
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4062
Sources EV-196fa7a6e2870b34a420d6a4 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 a22ae06f50761d777879ce2c950c1eb70e6abee85f2dcca27146683b53e7aafd Usage terms US government public domain
Observations for this power asset