POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Lewiston Niagara / 6

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)20 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-10955206616af8e1f48c95e5
Net Summer Capacity (MW)20 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-10955206616af8e1f48c95e5
Net Winter Capacity (MW)20 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-10955206616af8e1f48c95e5
Detailed source fields
Original source fieldPublished value or condition
Entity ID15296
Entity NameNew York Power Authority
Plant ID2692
Plant NameLewiston Niagara
Google MapMap
Bing MapMap
Plant StateNY
CountyNiagara
Balancing Authority CodeNYIS
SectorElectric Utility
Generator ID6
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month2
Operating Year1962
Status(OP) Operating
Latitude43.142973
Longitude-79.02196
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:4022

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4017

Sources EV-3c6dfb497d0f3e316ec34ad5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d1d28e1ef2020ded8e3dfe2ed4bd97a804490085528923e9f5e48dff30118103

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4022

Sources EV-10955206616af8e1f48c95e5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f43f3682f74ce7cfbf120c4a598b61b202d8ef039eee854ae1956631ba0fd469

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lewiston Niagara / 6

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID15296
Utility NameNew York Power Authority
Plant Code2692
Plant NameLewiston Niagara
StateNY
CountyNiagara
Generator ID6
TechnologyHydroelectric Pumped Storage
Prime MoverPS
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)20
Nameplate Power Factor1
Summer Capacity (MW)20
Winter Capacity (MW)20
Minimum Load (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month2
Operating Year1962
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:4017

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:4017

Sources EV-3c6dfb497d0f3e316ec34ad5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d1d28e1ef2020ded8e3dfe2ed4bd97a804490085528923e9f5e48dff30118103

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lewiston Niagara / 6

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID15296
Entity NameNew York Power Authority
Plant ID2692
Plant NameLewiston Niagara
Google MapMap
Bing MapMap
Plant StateNY
CountyNiagara
Balancing Authority CodeNYIS
SectorElectric Utility
Generator ID6
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month2
Operating Year1962
Status(OP) Operating
Latitude43.142973
Longitude-79.02196
Original text(OP) Operating
source_record_idOperating:4022

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:4022

Sources EV-10955206616af8e1f48c95e5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f43f3682f74ce7cfbf120c4a598b61b202d8ef039eee854ae1956631ba0fd469

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel