POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Fulton Hydro / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-f92f4aa5c90917c96d402fa3
Net Summer Capacity (MW)0.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-f92f4aa5c90917c96d402fa3
Net Winter Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-f92f4aa5c90917c96d402fa3
Detailed source fields
Original source fieldPublished value or condition
Entity ID5914
Entity NameErie Boulevard Hydropower LP
Plant ID2566
Plant NameFulton Hydro
Google MapMap
Bing MapMap
Plant StateNY
CountyOswego
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1928
Status(OP) Operating
Latitude43.32411
Longitude-76.41898
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3863

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3858

Sources EV-f9cc10fe3f296d33ed72e9fa
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 40387906f801108a0b70f064bc4983fddf00db1336388b916d91fd11d649bf82

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3863

Sources EV-f92f4aa5c90917c96d402fa3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f943c66d120d9e1cd9f28d15a8ef011c631b9b4d0d0911bf2a95f68c55f85ff0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Fulton Hydro / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5914
Utility NameErie Boulevard Hydropower LP
Plant Code2566
Plant NameFulton Hydro
StateNY
CountyOswego
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node Designation24041
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERC24041
Nameplate Capacity (MW)0.5
Nameplate Power Factor0.8
Summer Capacity (MW)0.1
Winter Capacity (MW)0.3
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month1
Operating Year1928
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3858

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3858

Sources EV-f9cc10fe3f296d33ed72e9fa
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 40387906f801108a0b70f064bc4983fddf00db1336388b916d91fd11d649bf82

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Fulton Hydro / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5914
Entity NameErie Boulevard Hydropower LP
Plant ID2566
Plant NameFulton Hydro
Google MapMap
Bing MapMap
Plant StateNY
CountyOswego
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)0.5
Net Summer Capacity (MW)0.1
Net Winter Capacity (MW)0.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1928
Status(OP) Operating
Latitude43.32411
Longitude-76.41898
Original text(OP) Operating
source_record_idOperating:3863

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3863

Sources EV-f92f4aa5c90917c96d402fa3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f943c66d120d9e1cd9f28d15a8ef011c631b9b4d0d0911bf2a95f68c55f85ff0

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel