Power assets and projects · USA · eia860m

Rio Grande / 8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)166.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3f64d4bde3a6dd5ca06b7e35
Net Summer Capacity (MW)139 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3f64d4bde3a6dd5ca06b7e35
Net Winter Capacity (MW)147 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3f64d4bde3a6dd5ca06b7e35
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID2444
Plant NameRio Grande
Google MapMap
Bing MapMap
Plant StateNM
CountyDona Ana
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)166.5
Net Summer Capacity (MW)139
Net Winter Capacity (MW)147
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month7
Operating Year1972
Planned Retirement Month12
Planned Retirement Year2033
Status(OP) Operating
Latitude31.8047
Longitude-106.5472
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3675

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3670

Sources EV-09c7b571f3e81fcff795e766
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7998a9fe125a0435876dd498f8d473163b9838bbc43793527f6cee62b8217495

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3675

Sources EV-3f64d4bde3a6dd5ca06b7e35
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 271b85574f546c8399a9eb7499ab117ff82765c50db5552ddb5944f3713d0afe

Usage terms US government public domain

Source snapshots by date · USA · eia860

Rio Grande / 8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5701
Utility NameEl Paso Electric Co
Plant Code2444
Plant NameRio Grande
StateNM
CountyDona Ana
Generator ID8
TechnologyNatural Gas Steam Turbine
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)166.5
Nameplate Power Factor0.9
Summer Capacity (MW)139
Winter Capacity (MW)147
Minimum Load (MW)44
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month7
Operating Year1972
Planned Retirement Month12
Planned Retirement Year2033
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Startup Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full LoadOVER
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3670

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3670

Sources EV-09c7b571f3e81fcff795e766
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7998a9fe125a0435876dd498f8d473163b9838bbc43793527f6cee62b8217495

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Rio Grande / 8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5701
Entity NameEl Paso Electric Co
Plant ID2444
Plant NameRio Grande
Google MapMap
Bing MapMap
Plant StateNM
CountyDona Ana
Balancing Authority CodeEPE
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)166.5
Net Summer Capacity (MW)139
Net Winter Capacity (MW)147
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month7
Operating Year1972
Planned Retirement Month12
Planned Retirement Year2033
Status(OP) Operating
Latitude31.8047
Longitude-106.5472
Original text(OP) Operating
source_record_idOperating:3675

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3675

Sources EV-3f64d4bde3a6dd5ca06b7e35
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 271b85574f546c8399a9eb7499ab117ff82765c50db5552ddb5944f3713d0afe

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel