POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Sunrise / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)81.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3a87e87af6b03eb568eedc3e
Net Summer Capacity (MW)80 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3a87e87af6b03eb568eedc3e
Net Winter Capacity (MW)80 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3a87e87af6b03eb568eedc3e
Detailed source fields
Original source fieldPublished value or condition
Entity ID13407
Entity NameNevada Power Co
Plant ID2326
Plant NameSunrise
Google MapMap
Bing MapMap
Plant StateNV
CountyClark
Balancing Authority CodeNEVP
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)81.6
Net Summer Capacity (MW)80
Net Winter Capacity (MW)80
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month5
Operating Year1964
Retirement Month12
Retirement Year2011
Latitude36.1384
Longitude-115.036
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4792

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1612

Sources EV-bf934094ca2ab28297ef896c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bcc69927be124fdf1a5ee903c2918a3b94d6ab4f2f840cd474c971084659911b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4792

Sources EV-3a87e87af6b03eb568eedc3e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ed4b43852595c291ce0744636fadd3b84090e9fc84aef759f1ae4c59a8ff5950

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Sunrise / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13407
Entity NameNevada Power Co
Plant ID2326
Plant NameSunrise
Google MapMap
Bing MapMap
Plant StateNV
CountyClark
Balancing Authority CodeNEVP
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)81.6
Net Summer Capacity (MW)80
Net Winter Capacity (MW)80
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month5
Operating Year1964
Retirement Month12
Retirement Year2011
Latitude36.1384
Longitude-115.036
Original textRetired
source_record_idRetired:4792

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4792

Sources EV-3a87e87af6b03eb568eedc3e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ed4b43852595c291ce0744636fadd3b84090e9fc84aef759f1ae4c59a8ff5950

Usage terms US government public domain

Source snapshots by date · USA · eia860

Sunrise / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13407
Utility NameNevada Power Co
Plant Code2326
Plant NameSunrise
StateNV
CountyClark
Generator ID1
TechnologyNatural Gas Steam Turbine
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)81.6
Summer Capacity (MW)80
Winter Capacity (MW)80
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month5
Operating Year1964
Retirement Month12
Retirement Year2011
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:1612

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1612

Sources EV-bf934094ca2ab28297ef896c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bcc69927be124fdf1a5ee903c2918a3b94d6ab4f2f840cd474c971084659911b

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel