POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Thompson Falls / TF3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0fa29a7d2528070056eda3df
Net Summer Capacity (MW)7.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0fa29a7d2528070056eda3df
Net Winter Capacity (MW)7.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0fa29a7d2528070056eda3df
Detailed source fields
Original source fieldPublished value or condition
Entity ID13902
Entity NameNorthWestern Energy (MT Hydro)
Plant ID2195
Plant NameThompson Falls
Google MapMap
Bing MapMap
Plant StateMT
CountySanders
Balancing Authority CodeNWMT
SectorElectric Utility
Generator IDTF3
Nameplate Capacity (MW)7
Net Summer Capacity (MW)7.5
Net Winter Capacity (MW)7.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month11
Operating Year1916
Status(OP) Operating
Latitude47.593155
Longitude-115.3582
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3352

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3346

Sources EV-8d3ae499e137ec1dadcb31f8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0f2722131916aad51c8a7a22907e259adb8cc9eaf329a538990bf7d22fc1b6b1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3352

Sources EV-0fa29a7d2528070056eda3df
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 62c67040bc21a378cca6c1412b2dc7ddddc85d3d6686e59b249c8c6b529c3ea0

Usage terms US government public domain

Source snapshots by date · USA · eia860

Thompson Falls / TF3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13902
Utility NameNorthWestern Energy (MT Hydro)
Plant Code2195
Plant NameThompson Falls
StateMT
CountySanders
Generator IDTF3
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationNA
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCNA
Nameplate Capacity (MW)7
Nameplate Power Factor0.8
Summer Capacity (MW)7.5
Winter Capacity (MW)7.5
Minimum Load (MW)1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month11
Operating Year1916
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3346

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3346

Sources EV-8d3ae499e137ec1dadcb31f8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0f2722131916aad51c8a7a22907e259adb8cc9eaf329a538990bf7d22fc1b6b1

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Thompson Falls / TF3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13902
Entity NameNorthWestern Energy (MT Hydro)
Plant ID2195
Plant NameThompson Falls
Google MapMap
Bing MapMap
Plant StateMT
CountySanders
Balancing Authority CodeNWMT
SectorElectric Utility
Generator IDTF3
Nameplate Capacity (MW)7
Net Summer Capacity (MW)7.5
Net Winter Capacity (MW)7.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month11
Operating Year1916
Status(OP) Operating
Latitude47.593155
Longitude-115.3582
Original text(OP) Operating
source_record_idOperating:3352

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3352

Sources EV-0fa29a7d2528070056eda3df
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 62c67040bc21a378cca6c1412b2dc7ddddc85d3d6686e59b249c8c6b529c3ea0

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel