Power assets and projects · USA · eia860m

Benndale / BENU1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)14.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c68cd412f0a4b20991229620
Net Summer Capacity (MW)11.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c68cd412f0a4b20991229620
Net Winter Capacity (MW)11.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c68cd412f0a4b20991229620
Detailed source fields
Original source fieldPublished value or condition
Entity ID17568
Entity NameCooperative Energy
Plant ID2068
Plant NameBenndale
Google MapMap
Bing MapMap
Plant StateMS
CountyGeorge
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBENU1
Nameplate Capacity (MW)14.2
Net Summer Capacity (MW)11.3
Net Winter Capacity (MW)11.3
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Operating Month4
Operating Year2020
Status(OP) Operating
Latitude30.8889
Longitude-88.8054
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3135

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3129

Sources EV-7e30e189b2918607acd45fda
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b86f8e233fe26bc9a8b173a1df02be6242fa3258f761070d21ea152c9e6f4ad1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3135

Sources EV-c68cd412f0a4b20991229620
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 46bea7351e3468d0c8476f2a7aacee4430a7cf6b71db307033b36069e180283c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Benndale / BENU1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID17568
Utility NameCooperative Energy
Plant Code2068
Plant NameBenndale
StateMS
CountyGeorge
Generator IDBENU1
TechnologyNatural Gas Internal Combustion Engine
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationSME.BENN_R_U1
Nameplate Capacity (MW)14.2
Nameplate Power Factor0.8
Summer Capacity (MW)11.3
Winter Capacity (MW)11.3
Minimum Load (MW)1.2
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year2020
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:3129

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3129

Sources EV-7e30e189b2918607acd45fda
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b86f8e233fe26bc9a8b173a1df02be6242fa3258f761070d21ea152c9e6f4ad1

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Benndale / BENU1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID17568
Entity NameCooperative Energy
Plant ID2068
Plant NameBenndale
Google MapMap
Bing MapMap
Plant StateMS
CountyGeorge
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBENU1
Nameplate Capacity (MW)14.2
Net Summer Capacity (MW)11.3
Net Winter Capacity (MW)11.3
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Operating Month4
Operating Year2020
Status(OP) Operating
Latitude30.8889
Longitude-88.8054
Original text(OP) Operating
source_record_idOperating:3135

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3135

Sources EV-c68cd412f0a4b20991229620
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 46bea7351e3468d0c8476f2a7aacee4430a7cf6b71db307033b36069e180283c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel