POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Chalk Hill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac409303aefd3718db395ef6
Net Summer Capacity (MW)2.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac409303aefd3718db395ef6
Net Winter Capacity (MW)2.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ac409303aefd3718db395ef6
Detailed source fields
Original source fieldPublished value or condition
Entity ID20847
Entity NameWisconsin Electric Power Co
Plant ID1776
Plant NameChalk Hill
Google MapMap
Bing MapMap
Plant StateMI
CountyMenominee
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)2.6
Net Summer Capacity (MW)2.6
Net Winter Capacity (MW)2.6
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1927
Status(OP) Operating
Latitude45.5136
Longitude-87.8011
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2764

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2755

Sources EV-60789045a0f0314c962ff1f3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 da4c5db76cae62c280af47152bc31ad6257139fcda0f1fee2ab6c2460ee1c38c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2764

Sources EV-ac409303aefd3718db395ef6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2bf338750113d5cd99999a6535317c9323f5fe1bb394ee74e54f00b3704d81ef

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Chalk Hill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID20847
Entity NameWisconsin Electric Power Co
Plant ID1776
Plant NameChalk Hill
Google MapMap
Bing MapMap
Plant StateMI
CountyMenominee
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)2.6
Net Summer Capacity (MW)2.6
Net Winter Capacity (MW)2.6
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1927
Status(OP) Operating
Latitude45.5136
Longitude-87.8011
Original text(OP) Operating
source_record_idOperating:2764

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2764

Sources EV-ac409303aefd3718db395ef6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2bf338750113d5cd99999a6535317c9323f5fe1bb394ee74e54f00b3704d81ef

Usage terms US government public domain

Source snapshots by date · USA · eia860

Chalk Hill / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID20847
Utility NameWisconsin Electric Power Co
Plant Code1776
Plant NameChalk Hill
StateMI
CountyMenominee
Generator ID3
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.6
Nameplate Power Factor0.8
Summer Capacity (MW)2.6
Winter Capacity (MW)2.6
Minimum Load (MW)1.7
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year1927
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:2755

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2755

Sources EV-60789045a0f0314c962ff1f3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 da4c5db76cae62c280af47152bc31ad6257139fcda0f1fee2ab6c2460ee1c38c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel