POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Oliver / 5 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 2.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8a53a6af201fd0ffdfca5368 Net Summer Capacity (MW) 3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8a53a6af201fd0ffdfca5368 Net Winter Capacity (MW) 3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8a53a6af201fd0ffdfca5368
Detailed source fields Original source field Published value or condition Entity ID 5109 Entity Name DTE Electric Company Plant ID 1735 Plant Name Oliver Google Map Map Bing Map Map Plant State MI County Huron Balancing Authority Code MISO Sector Electric Utility Generator ID 5 Nameplate Capacity (MW) 2.7 Net Summer Capacity (MW) 3 Net Winter Capacity (MW) 3 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code IC Operating Month 1 Operating Year 1970 Status (OP) Operating Latitude 43.8264 Longitude -83.2383 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:2624
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2615
Sources EV-c2042dd417aaf40d4c3cca25 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b195fcf9b1feacda099a01a61ca4316157227759f3655d47d75282840ce38931 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2624
Sources EV-8a53a6af201fd0ffdfca5368 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 58785465122539ac1ebe5e1155c36cb6f07968b58c2be2f1c3005a5af3f1f9ad Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Oliver / 5 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 5109 Entity Name DTE Electric Company Plant ID 1735 Plant Name Oliver Google Map Map Bing Map Map Plant State MI County Huron Balancing Authority Code MISO Sector Electric Utility Generator ID 5 Nameplate Capacity (MW) 2.7 Net Summer Capacity (MW) 3 Net Winter Capacity (MW) 3 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code IC Operating Month 1 Operating Year 1970 Status (OP) Operating Latitude 43.8264 Longitude -83.2383 Original text (OP) Operating source_record_id Operating:2624
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2624
Sources EV-8a53a6af201fd0ffdfca5368 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 58785465122539ac1ebe5e1155c36cb6f07968b58c2be2f1c3005a5af3f1f9ad Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Oliver / 5 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 5109 Utility Name DTE Electric Company Plant Code 1735 Plant Name Oliver State MI County Huron Generator ID 5 Technology Petroleum Liquids Prime Mover IC Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 2.7 Nameplate Power Factor 0.8 Summer Capacity (MW) 3 Winter Capacity (MW) 3 Minimum Load (MW) 0.6 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 1 Operating Year 1970 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 DFO Solid Fuel Gasification System? N Carbon Capture Technology? N Time from Cold Shutdown to Full Load 10M Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:2615
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2615
Sources EV-c2042dd417aaf40d4c3cca25 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 b195fcf9b1feacda099a01a61ca4316157227759f3655d47d75282840ce38931 Usage terms US government public domain
Observations for this power asset