POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Monroe (MI) / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)822.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-870a10a51542c4dcc47b3c36
Net Summer Capacity (MW)773 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-870a10a51542c4dcc47b3c36
Net Winter Capacity (MW)783 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-870a10a51542c4dcc47b3c36
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1733
Plant NameMonroe (MI)
Google MapMap
Bing MapMap
Plant StateMI
CountyMonroe
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)822.6
Net Summer Capacity (MW)773
Net Winter Capacity (MW)783
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month3
Operating Year1973
Planned Retirement Month12
Planned Retirement Year2032
Status(OP) Operating
Latitude41.8906
Longitude-83.3464
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2606

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2597

Sources EV-cf4485c02c20e5e16e1ffc64
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8b12f198b93e5453f710421e3de1ed10bf5fc35da5adc074a4dc6354aa1c3d50

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2606

Sources EV-870a10a51542c4dcc47b3c36
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 78630aa8f2eb7c9140dbc11050c3726bab74d1a8ac197c865d79177247c553c9

Usage terms US government public domain

Source snapshots by date · USA · eia860

Monroe (MI) / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code1733
Plant NameMonroe (MI)
StateMI
CountyMonroe
Generator ID2
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)822.6
Nameplate Power Factor0.95
Summer Capacity (MW)773
Winter Capacity (MW)783
Minimum Load (MW)280
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year1973
Planned Retirement Month12
Planned Retirement Year2032
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1SUB
Energy Source 2RC
Energy Source 3BIT
Energy Source 4PC
Energy Source 5DFO
Startup Source 1DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load12H
Pulverized Coal Technology?Y
Supercritical Technology?Y
Multiple Fuels?Y
Cofire Fuels?Y
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:2597

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2597

Sources EV-cf4485c02c20e5e16e1ffc64
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8b12f198b93e5453f710421e3de1ed10bf5fc35da5adc074a4dc6354aa1c3d50

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Monroe (MI) / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1733
Plant NameMonroe (MI)
Google MapMap
Bing MapMap
Plant StateMI
CountyMonroe
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)822.6
Net Summer Capacity (MW)773
Net Winter Capacity (MW)783
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month3
Operating Year1973
Planned Retirement Month12
Planned Retirement Year2032
Status(OP) Operating
Latitude41.8906
Longitude-83.3464
Original text(OP) Operating
source_record_idOperating:2606

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2606

Sources EV-870a10a51542c4dcc47b3c36
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 78630aa8f2eb7c9140dbc11050c3726bab74d1a8ac197c865d79177247c553c9

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel