Power assets and projects · USA · eia860m

Marysville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)75 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-0ce4f642e533c2ef445504b8
Net Summer Capacity (MW)83 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-0ce4f642e533c2ef445504b8
Net Winter Capacity (MW)83 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-0ce4f642e533c2ef445504b8
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1732
Plant NameMarysville
Google MapMap
Bing MapMap
Plant StateMI
CountySt Clair
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)75
Net Summer Capacity (MW)83
Net Winter Capacity (MW)83
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month2
Operating Year1947
Retirement Month12
Retirement Year2011
Latitude42.9256
Longitude-82.4606
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4791

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1238

Sources EV-04abcd6d664537a91b7fc8ce
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e0f76ea16d3ae1fb7d261c6db5876cc5affab35c66679e3f8ee5fd80b970dcc8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4791

Sources EV-0ce4f642e533c2ef445504b8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c4848e876f6d588f3a65729ebb382161d69db5529e1df80efda928d68441c10d

Usage terms US government public domain

Source snapshots by date · USA · eia860

Marysville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code1732
Plant NameMarysville
StateMI
CountySt Clair
Generator ID8
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)75
Summer Capacity (MW)83
Winter Capacity (MW)83
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month2
Operating Year1947
Retirement Month12
Retirement Year2011
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1BIT
Startup Source 1NG
Solid Fuel Gasification System?N
Pulverized Coal Technology?Y
Subcritical Technology?Y
Supercritical Technology?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:1238

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1238

Sources EV-04abcd6d664537a91b7fc8ce
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e0f76ea16d3ae1fb7d261c6db5876cc5affab35c66679e3f8ee5fd80b970dcc8

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Marysville / 8

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1732
Plant NameMarysville
Google MapMap
Bing MapMap
Plant StateMI
CountySt Clair
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)75
Net Summer Capacity (MW)83
Net Winter Capacity (MW)83
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month2
Operating Year1947
Retirement Month12
Retirement Year2011
Latitude42.9256
Longitude-82.4606
Original textRetired
source_record_idRetired:4791

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4791

Sources EV-0ce4f642e533c2ef445504b8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c4848e876f6d588f3a65729ebb382161d69db5529e1df80efda928d68441c10d

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel