POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Hancock / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)19 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1541fb9d148c63bfbca42005
Net Summer Capacity (MW)11 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1541fb9d148c63bfbca42005
Net Winter Capacity (MW)18 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1541fb9d148c63bfbca42005
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1730
Plant NameHancock
Google MapMap
Bing MapMap
Plant StateMI
CountyOakland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)19
Net Summer Capacity (MW)11
Net Winter Capacity (MW)18
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month9
Operating Year1967
Status(OP) Operating
Latitude42.5497
Longitude-83.4425
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2601

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2592

Sources EV-2428f3ceb6a7a5e12a8f0ea0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f4b40260834a1bc63a53416a5d231cabd332e5495bf29e38f7b0a9f342d18104

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2601

Sources EV-1541fb9d148c63bfbca42005
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7b08b72f218b7792fdf69b064c0fa634e786d42a3a032e1eb97a11d0736149ed

Usage terms US government public domain

Source snapshots by date · USA · eia860

Hancock / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code1730
Plant NameHancock
StateMI
CountyOakland
Generator ID1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)19
Nameplate Power Factor0.85
Summer Capacity (MW)11
Winter Capacity (MW)18
Minimum Load (MW)3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year1967
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:2592

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2592

Sources EV-2428f3ceb6a7a5e12a8f0ea0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f4b40260834a1bc63a53416a5d231cabd332e5495bf29e38f7b0a9f342d18104

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Hancock / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1730
Plant NameHancock
Google MapMap
Bing MapMap
Plant StateMI
CountyOakland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)19
Net Summer Capacity (MW)11
Net Winter Capacity (MW)18
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month9
Operating Year1967
Status(OP) Operating
Latitude42.5497
Longitude-83.4425
Original text(OP) Operating
source_record_idOperating:2601

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2601

Sources EV-1541fb9d148c63bfbca42005
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7b08b72f218b7792fdf69b064c0fa634e786d42a3a032e1eb97a11d0736149ed

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel