Power assets and projects · USA · eia860m

Dayton (MI) / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-763643c61caea2337d9939ae
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-763643c61caea2337d9939ae
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-763643c61caea2337d9939ae
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1727
Plant NameDayton (MI)
Google MapMap
Bing MapMap
Plant StateMI
CountyWayne
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month4
Operating Year1966
Retirement Month11
Retirement Year2013
Latitude42.1758
Longitude-83.5336
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4034

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1230

Sources EV-adb473ed8bad607d78f7a626
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac03001a63672bf5013059e7ddefceb3e5512d8e90601dcf93c5b3aff85ace6d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4034

Sources EV-763643c61caea2337d9939ae
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f5b9eba93320b872f7911813a212c6f938f962cf103f83545052d1be80d7ac64

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Dayton (MI) / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1727
Plant NameDayton (MI)
Google MapMap
Bing MapMap
Plant StateMI
CountyWayne
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month4
Operating Year1966
Retirement Month11
Retirement Year2013
Latitude42.1758
Longitude-83.5336
Original textRetired
source_record_idRetired:4034

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4034

Sources EV-763643c61caea2337d9939ae
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f5b9eba93320b872f7911813a212c6f938f962cf103f83545052d1be80d7ac64

Usage terms US government public domain

Source snapshots by date · USA · eia860

Dayton (MI) / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code1727
Plant NameDayton (MI)
StateMI
CountyWayne
Generator ID5
TechnologyPetroleum Liquids
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Summer Capacity (MW)2
Winter Capacity (MW)2
Minimum Load (MW)2
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month4
Operating Year1966
Retirement Month11
Retirement Year2013
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Solid Fuel Gasification System?N
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:1230

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1230

Sources EV-adb473ed8bad607d78f7a626
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac03001a63672bf5013059e7ddefceb3e5512d8e90601dcf93c5b3aff85ace6d

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel