Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Weston Hydro / WE4 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03cf3815ff938ffe55d1658f Net Summer Capacity (MW) 3.3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03cf3815ff938ffe55d1658f Net Winter Capacity (MW) 3.3 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-03cf3815ff938ffe55d1658f
Detailed source fields Original source field Published value or condition Entity ID 39006 Entity Name Brookfield White Pine Hydro LLC Plant ID 1509 Plant Name Weston Hydro Google Map Map Bing Map Map Plant State ME County Somerset Balancing Authority Code ISNE Sector IPP Non-CHP Generator ID WE4 Nameplate Capacity (MW) 3 Net Summer Capacity (MW) 3.3 Net Winter Capacity (MW) 3.3 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 1 Operating Year 1923 Status (OP) Operating Latitude 44.763875 Longitude -69.71828 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:2423
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2413
Sources EV-5c2a21f456d6124c3f93e47f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 faa5e8b66985422551d168557507554541c25c06537f4397bbd647a1d8ba1fe6 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2423
Sources EV-03cf3815ff938ffe55d1658f Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 606ee22f8487d99fa4d648150d398f4a39cc4e5b69516169a5901d51609116a7 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Weston Hydro / WE4 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 39006 Utility Name Brookfield White Pine Hydro LLC Plant Code 1509 Plant Name Weston Hydro State ME County Somerset Generator ID WE4 Technology Conventional Hydroelectric Prime Mover HY Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 3 Nameplate Power Factor 0.8 Summer Capacity (MW) 3.3 Winter Capacity (MW) 3.3 Minimum Load (MW) 0.1 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 1 Operating Year 1923 Associated with Combined Heat and Power System N Sector Name IPP Non-CHP Sector 2 Topping or Bottoming X Energy Source 1 WAT Turbines or Hydrokinetic Buoys 0 Time from Cold Shutdown to Full Load 10M Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:2413
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2413
Sources EV-5c2a21f456d6124c3f93e47f Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 faa5e8b66985422551d168557507554541c25c06537f4397bbd647a1d8ba1fe6 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860m Weston Hydro / WE4 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 39006 Entity Name Brookfield White Pine Hydro LLC Plant ID 1509 Plant Name Weston Hydro Google Map Map Bing Map Map Plant State ME County Somerset Balancing Authority Code ISNE Sector IPP Non-CHP Generator ID WE4 Nameplate Capacity (MW) 3 Net Summer Capacity (MW) 3.3 Net Winter Capacity (MW) 3.3 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 1 Operating Year 1923 Status (OP) Operating Latitude 44.763875 Longitude -69.71828 Original text (OP) Operating source_record_id Operating:2423
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2423
Sources EV-03cf3815ff938ffe55d1658f Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 606ee22f8487d99fa4d648150d398f4a39cc4e5b69516169a5901d51609116a7 Usage terms US government public domain