Power assets and projects · USA · eia860m

Mormon Flat / MF2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)54.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6fbb92201ae3ebc1e520606b
Net Summer Capacity (MW)57.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6fbb92201ae3ebc1e520606b
Net Winter Capacity (MW)57.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6fbb92201ae3ebc1e520606b
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID148
Plant NameMormon Flat
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDMF2
Nameplate Capacity (MW)54.3
Net Summer Capacity (MW)57.3
Net Winter Capacity (MW)57.3
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month6
Operating Year1971
Status(OP) Operating
Latitude33.5536
Longitude-111.4431
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:320

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:319

Sources EV-fb29bc1b9d64ba001321e4ab
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c76f25e8311d4e289aedda6d5b943c1010684454980a1e39548a5b7a94a6b777

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:320

Sources EV-6fbb92201ae3ebc1e520606b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 59810534025a29c652edebea16bd430bb9c183ceb2d753c953dbcb2e7c881ff9

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mormon Flat / MF2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID16572
Utility NameSalt River Project
Plant Code148
Plant NameMormon Flat
StateAZ
CountyMaricopa
Generator IDMF2
TechnologyHydroelectric Pumped Storage
Prime MoverPS
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)54.3
Nameplate Power Factor0.9
Summer Capacity (MW)57.3
Winter Capacity (MW)57.3
Minimum Load (MW)10
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1971
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:319

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:319

Sources EV-fb29bc1b9d64ba001321e4ab
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c76f25e8311d4e289aedda6d5b943c1010684454980a1e39548a5b7a94a6b777

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mormon Flat / MF2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID148
Plant NameMormon Flat
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDMF2
Nameplate Capacity (MW)54.3
Net Summer Capacity (MW)57.3
Net Winter Capacity (MW)57.3
TechnologyHydroelectric Pumped Storage
Energy Source CodeWAT
Prime Mover CodePS
Operating Month6
Operating Year1971
Status(OP) Operating
Latitude33.5536
Longitude-111.4431
Original text(OP) Operating
source_record_idOperating:320

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:320

Sources EV-6fbb92201ae3ebc1e520606b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 59810534025a29c652edebea16bd430bb9c183ceb2d753c953dbcb2e7c881ff9

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel