POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Horse Mesa / HM1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)9.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7a1784dc49657ed97f9ec4df
Net Summer Capacity (MW)10 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7a1784dc49657ed97f9ec4df
Net Winter Capacity (MW)10 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-7a1784dc49657ed97f9ec4df
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID145
Plant NameHorse Mesa
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDHM1
Nameplate Capacity (MW)9.9
Net Summer Capacity (MW)10
Net Winter Capacity (MW)10
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month4
Operating Year1927
Status(OP) Operating
Latitude33.5907
Longitude-111.344
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:308

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:307

Sources EV-8960e9955437cf5c8c9d0826
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2fda5016bcff40ff8f820f83a43bda533a6f1d0314bd0a916052287d98b29f58

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:308

Sources EV-7a1784dc49657ed97f9ec4df
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 111a54b0e69ebefe393f82580fdaaa39d666f4bab61db01a21dc85559c557d27

Usage terms US government public domain

Source snapshots by date · USA · eia860

Horse Mesa / HM1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID16572
Utility NameSalt River Project
Plant Code145
Plant NameHorse Mesa
StateAZ
CountyMaricopa
Generator IDHM1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)9.9
Nameplate Power Factor0.9
Summer Capacity (MW)10
Winter Capacity (MW)10
Minimum Load (MW)3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month4
Operating Year1927
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Other Planned Modifications?N
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:307

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:307

Sources EV-8960e9955437cf5c8c9d0826
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2fda5016bcff40ff8f820f83a43bda533a6f1d0314bd0a916052287d98b29f58

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Horse Mesa / HM1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID145
Plant NameHorse Mesa
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDHM1
Nameplate Capacity (MW)9.9
Net Summer Capacity (MW)10
Net Winter Capacity (MW)10
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month4
Operating Year1927
Status(OP) Operating
Latitude33.5907
Longitude-111.344
Original text(OP) Operating
source_record_idOperating:308

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:308

Sources EV-7a1784dc49657ed97f9ec4df
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 111a54b0e69ebefe393f82580fdaaa39d666f4bab61db01a21dc85559c557d27

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel