POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Ocotillo / GT5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)140 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-63f88801d23224dc0cbe25d5
Net Summer Capacity (MW)104 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-63f88801d23224dc0cbe25d5
Net Winter Capacity (MW)105 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-63f88801d23224dc0cbe25d5
Detailed source fields
Original source fieldPublished value or condition
Entity ID803
Entity NameArizona Public Service Co
Plant ID116
Plant NameOcotillo
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeAZPS
SectorElectric Utility
Generator IDGT5
Nameplate Capacity (MW)140
Net Summer Capacity (MW)104
Net Winter Capacity (MW)105
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month5
Operating Year2019
Status(OP) Operating
Latitude33.4225
Longitude-111.9122
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:250

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:249

Sources EV-76f5f24cca89aa596fb0d758
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b62e061f5d8d3c75df7fb48f37c6e001efc12491ec6f3fac3c4892aee23867f3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:250

Sources EV-63f88801d23224dc0cbe25d5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1e7d26d73e11ac198aaf9974202c91b604be8f513fb8869e7be49e3f679a0e43

Usage terms US government public domain

Source snapshots by date · USA · eia860

Ocotillo / GT5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID803
Utility NameArizona Public Service Co
Plant Code116
Plant NameOcotillo
StateAZ
CountyMaricopa
Generator IDGT5
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)140
Nameplate Power Factor0.85
Summer Capacity (MW)104
Winter Capacity (MW)105
Minimum Load (MW)45
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year2019
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:249

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:249

Sources EV-76f5f24cca89aa596fb0d758
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b62e061f5d8d3c75df7fb48f37c6e001efc12491ec6f3fac3c4892aee23867f3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Ocotillo / GT5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID803
Entity NameArizona Public Service Co
Plant ID116
Plant NameOcotillo
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeAZPS
SectorElectric Utility
Generator IDGT5
Nameplate Capacity (MW)140
Net Summer Capacity (MW)104
Net Winter Capacity (MW)105
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month5
Operating Year2019
Status(OP) Operating
Latitude33.4225
Longitude-111.9122
Original text(OP) Operating
source_record_idOperating:250

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:250

Sources EV-63f88801d23224dc0cbe25d5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1e7d26d73e11ac198aaf9974202c91b604be8f513fb8869e7be49e3f679a0e43

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel