POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Dillingham / 15

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18a8f0ed67b7e06d0ba3ccb6
Net Summer Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18a8f0ed67b7e06d0ba3ccb6
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18a8f0ed67b7e06d0ba3ccb6
Detailed source fields
Original source fieldPublished value or condition
Entity ID13870
Entity NameNushagak Electric Coop, Inc
Plant ID109
Plant NameDillingham
Google MapMap
Bing MapMap
Plant StateAK
CountyDillingham
SectorElectric Utility
Generator ID15
Nameplate Capacity (MW)1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month5
Operating Year2008
Status(OP) Operating
Latitude59.042914
Longitude-158.4686
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:242

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:241

Sources EV-41bfd3643896ee313e85b1b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 850fc1faa5e7ccf72e009be4442ab9240c23028b89e4c4e6d604e038ee28daef

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:242

Sources EV-18a8f0ed67b7e06d0ba3ccb6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 37110c7eb7d4a6fbd554fa3bcc6852676756394074d45b11b358b9d46e39e475

Usage terms US government public domain

Source snapshots by date · USA · eia860

Dillingham / 15

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13870
Utility NameNushagak Electric Coop, Inc
Plant Code109
Plant NameDillingham
StateAK
CountyDillingham
Generator ID15
TechnologyPetroleum Liquids
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1
Nameplate Power Factor0.8
Summer Capacity (MW)1
Winter Capacity (MW)1
Minimum Load (MW)0.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month5
Operating Year2008
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:241

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:241

Sources EV-41bfd3643896ee313e85b1b2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 850fc1faa5e7ccf72e009be4442ab9240c23028b89e4c4e6d604e038ee28daef

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Dillingham / 15

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13870
Entity NameNushagak Electric Coop, Inc
Plant ID109
Plant NameDillingham
Google MapMap
Bing MapMap
Plant StateAK
CountyDillingham
SectorElectric Utility
Generator ID15
Nameplate Capacity (MW)1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month5
Operating Year2008
Status(OP) Operating
Latitude59.042914
Longitude-158.4686
Original text(OP) Operating
source_record_idOperating:242

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:242

Sources EV-18a8f0ed67b7e06d0ba3ccb6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 37110c7eb7d4a6fbd554fa3bcc6852676756394074d45b11b358b9d46e39e475

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel