POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Townsend Hydro / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a7e1c5c5679ee006ae9ad6e8
Net Summer Capacity (MW)2.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a7e1c5c5679ee006ae9ad6e8
Net Winter Capacity (MW)2.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a7e1c5c5679ee006ae9ad6e8
Detailed source fields
Original source fieldPublished value or condition
Entity ID1528
Entity NameBeaver Falls Municipal Auth - (PA)
Plant ID10285
Plant NameTownsend Hydro
Google MapMap
Bing MapMap
Plant StatePA
CountyBeaver
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDGEN2
Nameplate Capacity (MW)2.6
Net Summer Capacity (MW)2.1
Net Winter Capacity (MW)2.1
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1987
Status(OP) Operating
Latitude40.733545
Longitude-80.3148
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8459

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8457

Sources EV-45dbc0478aaaa9753833742a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 64f23328d4c099f8d3d5e132ef4298d0c400093d3afb9e4a452c68640597b3a3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8459

Sources EV-a7e1c5c5679ee006ae9ad6e8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dfa41cdbda0cabaa5adabcb1e218daaa398bfaa72a69f177cd84ab97b47d73b5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Townsend Hydro / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1528
Utility NameBeaver Falls Municipal Auth - (PA)
Plant Code10285
Plant NameTownsend Hydro
StatePA
CountyBeaver
Generator IDGEN2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.6
Nameplate Power Factor0.9
Summer Capacity (MW)2.1
Winter Capacity (MW)2.1
Minimum Load (MW)0.5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year1987
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:8457

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8457

Sources EV-45dbc0478aaaa9753833742a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 64f23328d4c099f8d3d5e132ef4298d0c400093d3afb9e4a452c68640597b3a3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Townsend Hydro / GEN2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1528
Entity NameBeaver Falls Municipal Auth - (PA)
Plant ID10285
Plant NameTownsend Hydro
Google MapMap
Bing MapMap
Plant StatePA
CountyBeaver
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDGEN2
Nameplate Capacity (MW)2.6
Net Summer Capacity (MW)2.1
Net Winter Capacity (MW)2.1
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1987
Status(OP) Operating
Latitude40.733545
Longitude-80.3148
Original text(OP) Operating
source_record_idOperating:8459

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8459

Sources EV-a7e1c5c5679ee006ae9ad6e8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dfa41cdbda0cabaa5adabcb1e218daaa398bfaa72a69f177cd84ab97b47d73b5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel