POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Stevens Mills Dam / 2

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.2 MWOriginal source column definition · Generator · RE
As-of date 2025
Sources EV-d4d8d3ca77196dbc185b4301
Summer Capacity (MW)0.2 MWOriginal source column definition · Generator · RE
As-of date 2025
Sources EV-d4d8d3ca77196dbc185b4301
Winter Capacity (MW)0.2 MWOriginal source column definition · Generator · RE
As-of date 2025
Sources EV-d4d8d3ca77196dbc185b4301
Minimum Load (MW)0.2 MWOriginal source column definition · Generator · RE
As-of date 2025
Sources EV-d4d8d3ca77196dbc185b4301
Detailed source fields
Original source fieldPublished value or condition
Utility ID57280
Utility NameEagle Creek Renewable Energy, LLC
Plant Code10109
Plant NameStevens Mills Dam
StateNH
CountyMerrimack
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.2
Nameplate Power Factor0.9
Summer Capacity (MW)0.2
Winter Capacity (MW)0.2
Minimum Load (MW)0.2
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month6
Operating Year1982
Retirement Month4
Retirement Year1997
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:3192

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3192

Sources EV-d4d8d3ca77196dbc185b4301
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 66021417a0a03e53c731b9db9ed8f14b6b753c71eff026da3362b8a9a61eab2d

Usage terms US government public domain

Source snapshots by date · USA · eia860

Stevens Mills Dam / 2

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57280
Utility NameEagle Creek Renewable Energy, LLC
Plant Code10109
Plant NameStevens Mills Dam
StateNH
CountyMerrimack
Generator ID2
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipW
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)0.2
Nameplate Power Factor0.9
Summer Capacity (MW)0.2
Winter Capacity (MW)0.2
Minimum Load (MW)0.2
Uprate or Derate Completed During YearN
StatusRE
Synchronized to Transmission GridX
Operating Month6
Operating Year1982
Retirement Month4
Retirement Year1997
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Time from Cold Shutdown to Full Load10M
Original textRE
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:3192

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3192

Sources EV-d4d8d3ca77196dbc185b4301
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 66021417a0a03e53c731b9db9ed8f14b6b753c71eff026da3362b8a9a61eab2d

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel