POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Lucky Peak Power Plant Project / U132

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)45 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-078fa0d6c639df5529632007
Net Summer Capacity (MW)36.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-078fa0d6c639df5529632007
Net Winter Capacity (MW)19.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-078fa0d6c639df5529632007
Detailed source fields
Original source fieldPublished value or condition
Entity ID1932
Entity NameBoise-Kuna Irrigation District
Plant ID10014
Plant NameLucky Peak Power Plant Project
Google MapMap
Bing MapMap
Plant StateID
CountyAda
Balancing Authority CodeIPCO
SectorIPP Non-CHP
Generator IDU132
Nameplate Capacity (MW)45
Net Summer Capacity (MW)36.2
Net Winter Capacity (MW)19.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1988
Status(OP) Operating
Latitude43.528
Longitude-116.0583
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8223

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8221

Sources EV-f61f76f3120b5faf49e145c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b65e3a3006ad7c1a130f05dc71387411af9df9132ee22d412af9d18dbbefbea7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8223

Sources EV-078fa0d6c639df5529632007
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 07e2e97e745005fdc0bb1d2051fe7f787c5053d6104fd4aa8b436fc5b0f1c0b3

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lucky Peak Power Plant Project / U132

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID1932
Utility NameBoise-Kuna Irrigation District
Plant Code10014
Plant NameLucky Peak Power Plant Project
StateID
CountyAda
Generator IDU132
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)45
Nameplate Power Factor0.9
Summer Capacity (MW)36.2
Winter Capacity (MW)19.2
Minimum Load (MW)5
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year1988
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:8221

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8221

Sources EV-f61f76f3120b5faf49e145c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b65e3a3006ad7c1a130f05dc71387411af9df9132ee22d412af9d18dbbefbea7

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lucky Peak Power Plant Project / U132

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID1932
Entity NameBoise-Kuna Irrigation District
Plant ID10014
Plant NameLucky Peak Power Plant Project
Google MapMap
Bing MapMap
Plant StateID
CountyAda
Balancing Authority CodeIPCO
SectorIPP Non-CHP
Generator IDU132
Nameplate Capacity (MW)45
Net Summer Capacity (MW)36.2
Net Winter Capacity (MW)19.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month10
Operating Year1988
Status(OP) Operating
Latitude43.528
Longitude-116.0583
Original text(OP) Operating
source_record_idOperating:8223

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8223

Sources EV-078fa0d6c639df5529632007
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 07e2e97e745005fdc0bb1d2051fe7f787c5053d6104fd4aa8b436fc5b0f1c0b3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel