POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 52items · current page 1–52 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Baranduda Electrical Energy Reserve Generator · Plan
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 4.39 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e Unit Capacity (MW AC) 4.39 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e Aggregated Nameplate Capacity (MW DC) 544.36 MWdc Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e Aggregated Nameplate Capacity (MW AC) 544.36 MWac Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e Agg Nameplate Storage Capacity (MWh) 1886.04 MWh Original source column definition · Generation-register unit · Anticipated As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e
Detailed source fields Original source field Published value or condition Survey ID 2326 Site Name Baranduda Electrical Energy Reserve KCI Id V00083 Site Owner Birdwood Energy Reserve Pty Ltd (ACN 658 507 441) as Trustee for Birdwood Energy Reserve Trust Region VIC1 Max Site Capacity (AC) 400 Gen Info Unit ID 232601 Unit Name BEER_GU1 Technology Type Battery Storage Technology Detail Lithium-ion Dispatch Type Scheduled Unit Count 124 Unit Capacity (MW DC) 4.39 Unit Capacity (MW AC) 4.39 Aggregated Nameplate Capacity (MW DC) 544.36 Aggregated Nameplate Capacity (MW AC) 544.36 Agg Nameplate Storage Capacity (MWh) 1886.04 Commitment Status Anticipated Full Commercial Use Date 2028-09-28T00:00:00 Expected Closure Year 2058 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-06-03T10:40:29 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:57
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:29
Sources EV-56de61399d0683f769ae8dd8 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d02b58c93c3a4175c9163471b383f1a172d89be1b416755085d464e30ef71328 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2326 Site Name Baranduda Electrical Energy Reserve KCI Id V00083 Site Owner Birdwood Energy Reserve Pty Ltd (ACN 658 507 441) as Trustee for Birdwood Energy Reserve Trust Region VIC1 Max Site Capacity (AC) 400 Gen Info Unit ID 232601 Unit Name BEER_GU1 Technology Type Battery Storage Technology Detail Lithium-ion Dispatch Type Scheduled Unit Count 124 Unit Capacity (MW DC) 4.39 Unit Capacity (MW AC) 4.39 Aggregated Nameplate Capacity (MW DC) 544.36 Aggregated Nameplate Capacity (MW AC) 544.36 Agg Nameplate Storage Capacity (MWh) 1886.04 Commitment Status Anticipated Full Commercial Use Date 2028-09-28T00:00:00 Expected Closure Year 2058 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-06-03T10:40:29 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Generator Information:57
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region VIC1 AEMO Survey ID 2326 Gen Info Unit ID 232601 Site Name Baranduda Electrical Energy Reserve Commitment Status Anticipated Expected Closure Year 2058 Survey Latest Update Date 2026-06-03T10:40:29 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Anticipated source_record_id Expected Closure Year:29
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:29
Sources EV-56de61399d0683f769ae8dd8 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d02b58c93c3a4175c9163471b383f1a172d89be1b416755085d464e30ef71328 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1796.36 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1516.46 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1818.61 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1480 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1659.29 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1571.12 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1552.54 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1498.96 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1593.425 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1637.51 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1533.96 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1754.93 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1774.1 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1735.75 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 1615.73 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 400 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-51aad1723b972c9292aeb68e 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:57
Sources EV-51aad1723b972c9292aeb68e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 761610a9aca4f012a7bde705b2688915a55039a22c2c0167c846e1d11100d9e9 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset