Power assets and projects · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generator · committed conditional

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4 MWdcOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75
Unit Capacity (MW AC)3.33 MWacOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75
Aggregated Nameplate Capacity (MW DC)360 MWdcOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75
Aggregated Nameplate Capacity (MW AC)299.7 MWacOriginal source column definition · Generation-register unit · Committed*
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75
Detailed source fields
Original source fieldPublished value or condition
Survey ID2017
Site NameBlind Creek Solar Farm and Battery Energy Storage System
Site OwnerMs BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust
RegionNSW1
Max Site Capacity (AC)300
Gen Info Unit ID201702
Unit NameBCSF
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count90
Unit Capacity (MW DC)4
Unit Capacity (MW AC)3.33
Aggregated Nameplate Capacity (MW DC)360
Aggregated Nameplate Capacity (MW AC)299.7
Commitment StatusCommitted*
Full Commercial Use Date2028-07-10T00:00:00
Expected Closure Year2053
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-18T12:08:14
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idGenerator Information:125

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:53

Sources EV-782bd8597d7bf5019c592d66
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 f24c1a76e048c669e31a910f2bf61de932a5f95ae59bf1ec176e845980935f04

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · committed conditional

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID2017
Site NameBlind Creek Solar Farm and Battery Energy Storage System
Site OwnerMs BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust
RegionNSW1
Max Site Capacity (AC)300
Gen Info Unit ID201702
Unit NameBCSF
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count90
Unit Capacity (MW DC)4
Unit Capacity (MW AC)3.33
Aggregated Nameplate Capacity (MW DC)360
Aggregated Nameplate Capacity (MW AC)299.7
Commitment StatusCommitted*
Full Commercial Use Date2028-07-10T00:00:00
Expected Closure Year2053
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-18T12:08:14
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idGenerator Information:125

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · committed conditional

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionNSW1
AEMO Survey ID2017
Gen Info Unit ID201702
Site NameBlind Creek Solar Farm and Battery Energy Storage System
Commitment StatusCommitted*
Expected Closure Year2053
Survey Latest Update Date2026-05-18T12:08:14
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted*
source_record_idExpected Closure Year:53

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:53

Sources EV-782bd8597d7bf5019c592d66
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 f24c1a76e048c669e31a910f2bf61de932a5f95ae59bf1ec176e845980935f04

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity275.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Blind Creek Solar Farm and Battery Energy Storage System

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity299.7 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-270197685d365593404d3b75

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:125

Sources EV-270197685d365593404d3b75
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 30b25d2567b3f9f977755ac78bda0cd82544642018a868bf13e5ac54c1ab507f

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel