Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 30items · current page 1–30 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bluegrass Solar Farm Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 148 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 Aggregated Nameplate Capacity (MW AC) 148 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558
Detailed source fields Original source field Published value or condition Survey ID 1903 Site Name Bluegrass Solar Farm Site Owner X-Elio Australia Pty Ltd Region QLD1 Max Site Capacity (AC) 148 Gen Info Unit ID 190301 Unit Name Bluegrass Solar Farm Technology Type Solar PV Technology Detail Single Axis Tracking DUID BLUEGSF1 Dispatch Type Semi-scheduled Unit Count 1 Unit Capacity (MW AC) 148 Aggregated Nameplate Capacity (MW AC) 148 Commitment Status In Service Full Commercial Use Date 2023-06-30T00:00:00 Expected Closure Year 2057 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-01-21T13:58:32 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:129
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:55
Sources EV-8c2db03f5f0fa0c1e8af0f56 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 477a2699b874645c67144b08d2f137a492a4a418740f7cf9fd7e3cec7a7efb6e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 1903 Gen Info Unit ID 190301 Site Name Bluegrass Solar Farm DUID BLUEGSF1 Commitment Status In Service Expected Closure Year 2057 Survey Latest Update Date 2026-01-21T13:58:32 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:55
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:55
Sources EV-8c2db03f5f0fa0c1e8af0f56 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 477a2699b874645c67144b08d2f137a492a4a418740f7cf9fd7e3cec7a7efb6e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1903 Site Name Bluegrass Solar Farm Site Owner X-Elio Australia Pty Ltd Region QLD1 Max Site Capacity (AC) 148 Gen Info Unit ID 190301 Unit Name Bluegrass Solar Farm Technology Type Solar PV Technology Detail Single Axis Tracking DUID BLUEGSF1 Dispatch Type Semi-scheduled Unit Count 1 Unit Capacity (MW AC) 148 Aggregated Nameplate Capacity (MW AC) 148 Commitment Status In Service Full Commercial Use Date 2023-06-30T00:00:00 Expected Closure Year 2057 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-01-21T13:58:32 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:129
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.99 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 141.11 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 146.32 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 140.47 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 138.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.37 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 144.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.99 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 145.78 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 138.6 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 145.22 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.98 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 144.67 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 141.74 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 143.54 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 139.22 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 139.84 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 140.47 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 137.98 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.37 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 141.74 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 142.48 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 139.84 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 139.22 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 137.98 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 141.11 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-32b39b3b47dd44432f16b558 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:129
Sources EV-32b39b3b47dd44432f16b558 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 d637614ed8b53b7712ad0ce49d947356b85acedf679607451f32b609117f7574 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset