POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 53items · current page 1–53 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Bouldercombe Battery project

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.25 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec
Unit Capacity (MW AC)1.25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec
Aggregated Nameplate Capacity (MW DC)50 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec
Aggregated Nameplate Capacity (MW AC)50 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec
Agg Nameplate Storage Capacity (MWh)100 MWhOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec
Detailed source fields
Original source fieldPublished value or condition
Survey ID1873
Site NameBouldercombe Battery project
KCI IdQ00004
Site OwnerGenex Power Limited
RegionQLD1
Max Site Capacity (AC)50
Gen Info Unit ID187301
Unit NameBLDRCMB1
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDBBATTERY1
Dispatch TypeScheduled
Unit Count40
Unit Capacity (MW DC)1.25
Unit Capacity (MW AC)1.25
Aggregated Nameplate Capacity (MW DC)50
Aggregated Nameplate Capacity (MW AC)50
Agg Nameplate Storage Capacity (MWh)100
Commitment StatusIn Service
Expected Closure Year2042
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-24T15:18:59
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:170

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:77

Sources EV-054f267a393c21bcc0a4162c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 13b82ac869b6017e69c3e1fcbb5acb1961f939d23ed308087ce8aae6f083c512

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1873
Site NameBouldercombe Battery project
KCI IdQ00004
Site OwnerGenex Power Limited
RegionQLD1
Max Site Capacity (AC)50
Gen Info Unit ID187301
Unit NameBLDRCMB1
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDBBATTERY1
Dispatch TypeScheduled
Unit Count40
Unit Capacity (MW DC)1.25
Unit Capacity (MW AC)1.25
Aggregated Nameplate Capacity (MW DC)50
Aggregated Nameplate Capacity (MW AC)50
Agg Nameplate Storage Capacity (MWh)100
Commitment StatusIn Service
Expected Closure Year2042
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-24T15:18:59
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:170

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Bouldercombe Battery project

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionQLD1
AEMO Survey ID1873
Gen Info Unit ID187301
Site NameBouldercombe Battery project
DUIDBBATTERY1
Commitment StatusIn Service
Expected Closure Year2042
Survey Latest Update Date2026-03-24T15:18:59
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:77

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:77

Sources EV-054f267a393c21bcc0a4162c
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 13b82ac869b6017e69c3e1fcbb5acb1961f939d23ed308087ce8aae6f083c512

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity92 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Storage Capacity100 MWhNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity46 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Bouldercombe Battery project

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity50 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-9012693f798cd5b73a3877ec

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:170

Sources EV-9012693f798cd5b73a3877ec
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 9c1058f67f87abc0fd4266258bead7fcd86a39ec8615624a442a24209744eb84

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel