POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Adelaide Desalination Plant

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)1.44 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-dbb9918d025e5d649f58048a
Aggregated Nameplate Capacity (MW AC)1.44 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-dbb9918d025e5d649f58048a
Detailed source fields
Original source fieldPublished value or condition
Survey ID1844
Site NameAdelaide Desalination Plant
Site OwnerSouth Australian Water Corporation
RegionSA1
Max Site Capacity (AC)26
Gen Info Unit ID184406
Unit NameADVMH1
Technology TypeHydro
Technology DetailRun of River
DUIDADPMH1
Dispatch TypeNon-scheduled
Unit Count1
Unit Capacity (MW AC)1.44
Aggregated Nameplate Capacity (MW AC)1.44
Commitment StatusIn Service
Expected Closure Year2050
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-18T15:29:04
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:8

Sources EV-dbb9918d025e5d649f58048a
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 c03aeebab1eff45415ef57b5fc7fea5b3c37e3faa3a17a4c887afb76eb7be901

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:4

Sources EV-b68ac1e2f0dbea31744a7550
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 5d58e7ffd9df253efb7c33ce7f268590072a661aa78f87253dce18b2021bfe82

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Adelaide Desalination Plant

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionSA1
AEMO Survey ID1844
Gen Info Unit ID184406
Site NameAdelaide Desalination Plant
DUIDADPMH1
Commitment StatusIn Service
Expected Closure Year2050
Survey Latest Update Date2026-03-18T15:29:04
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:4

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:4

Sources EV-b68ac1e2f0dbea31744a7550
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 5d58e7ffd9df253efb7c33ce7f268590072a661aa78f87253dce18b2021bfe82

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Adelaide Desalination Plant

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1844
Site NameAdelaide Desalination Plant
Site OwnerSouth Australian Water Corporation
RegionSA1
Max Site Capacity (AC)26
Gen Info Unit ID184406
Unit NameADVMH1
Technology TypeHydro
Technology DetailRun of River
DUIDADPMH1
Dispatch TypeNon-scheduled
Unit Count1
Unit Capacity (MW AC)1.44
Aggregated Nameplate Capacity (MW AC)1.44
Commitment StatusIn Service
Expected Closure Year2050
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-18T15:29:04
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:8

Sources EV-dbb9918d025e5d649f58048a
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 c03aeebab1eff45415ef57b5fc7fea5b3c37e3faa3a17a4c887afb76eb7be901

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel