Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 363 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 Aggregated Nameplate Capacity (MW AC) 363 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 Agg Nameplate Storage Capacity (MWh) 58330 MWh Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120
Detailed source fields Original source field Published value or condition Survey ID 1752 Site Name Snowy 2.0. Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 2200 Gen Info Unit ID 175205 Unit Name SNO2PH05 Technology Type Hydro Technology Detail Pumped Hydro Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 363 Aggregated Nameplate Capacity (MW AC) 363 Agg Nameplate Storage Capacity (MWh) 58330 Commitment Status Committed Full Commercial Use Date 2028-12-31T00:00:00 Expected Closure Year 2129 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-06-11T11:38:24 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:1340
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:621
Sources EV-d06203ea03e67fe1f733ecc2 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 f6dc007d4f7390741c6df0199124011f73c86e933459cc8e8529abb38d823c6a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region NSW1 AEMO Survey ID 1752 Gen Info Unit ID 175205 Site Name Snowy 2.0. Commitment Status Committed Expected Closure Year 2129 Survey Latest Update Date 2026-06-11T11:38:24 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Expected Closure Year:621
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:621
Sources EV-d06203ea03e67fe1f733ecc2 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 f6dc007d4f7390741c6df0199124011f73c86e933459cc8e8529abb38d823c6a Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1752 Site Name Snowy 2.0. Site Owner Snowy Hydro Ltd Region NSW1 Max Site Capacity (AC) 2200 Gen Info Unit ID 175205 Unit Name SNO2PH05 Technology Type Hydro Technology Detail Pumped Hydro Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 363 Aggregated Nameplate Capacity (MW AC) 363 Agg Nameplate Storage Capacity (MWh) 58330 Commitment Status Committed Full Commercial Use Date 2028-12-31T00:00:00 Expected Closure Year 2129 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-06-11T11:38:24 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:1340
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 58330 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 363 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-18b3d3068850676aca696120 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1340
Sources EV-18b3d3068850676aca696120 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a6f16bbb64f68ff6ce7481d8f9137dd2d51a8eeb6046ca2da21569eca8d4798b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset