Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Ballarat Energy Storage System Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 1.77 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa Unit Capacity (MW AC) 1.77 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa Aggregated Nameplate Capacity (MW DC) 30.09 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa Aggregated Nameplate Capacity (MW AC) 30.09 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa Agg Nameplate Storage Capacity (MWh) 30.09 MWh Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa
Detailed source fields Original source field Published value or condition Survey ID 1469 Site Name Ballarat Energy Storage System Site Owner Ausnet Transmission Group Pty Ltd Region VIC1 Max Site Capacity (AC) 30 Gen Info Unit ID 146901 Unit Name Ballarat Energy Storage System:1 Technology Type Battery Storage Technology Detail Lithium-ion DUID BALB1 Dispatch Type Scheduled Unit Count 17 Unit Capacity (MW DC) 1.77 Unit Capacity (MW AC) 1.77 Aggregated Nameplate Capacity (MW DC) 30.09 Aggregated Nameplate Capacity (MW AC) 30.09 Agg Nameplate Storage Capacity (MWh) 30.09 Commitment Status In Service Expected Closure Year 2033 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-24T17:04:09 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:48
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:22
Sources EV-972f7f7b814f007b901ab5c1 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 fb3934dd776c35f3449bb3bdfe5239c2f367e89f853854653fa7181bb1f622cb Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region VIC1 AEMO Survey ID 1469 Gen Info Unit ID 146901 Site Name Ballarat Energy Storage System DUID BALB1 Commitment Status In Service Expected Closure Year 2033 Survey Latest Update Date 2026-03-24T17:04:09 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:22
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:22
Sources EV-972f7f7b814f007b901ab5c1 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 fb3934dd776c35f3449bb3bdfe5239c2f367e89f853854653fa7181bb1f622cb Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1469 Site Name Ballarat Energy Storage System Site Owner Ausnet Transmission Group Pty Ltd Region VIC1 Max Site Capacity (AC) 30 Gen Info Unit ID 146901 Unit Name Ballarat Energy Storage System:1 Technology Type Battery Storage Technology Detail Lithium-ion DUID BALB1 Dispatch Type Scheduled Unit Count 17 Unit Capacity (MW DC) 1.77 Unit Capacity (MW AC) 1.77 Aggregated Nameplate Capacity (MW DC) 30.09 Aggregated Nameplate Capacity (MW AC) 30.09 Agg Nameplate Storage Capacity (MWh) 30.09 Commitment Status In Service Expected Closure Year 2033 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-24T17:04:09 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:48
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 19.7 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 29.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 29.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 29.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 22.8 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 22.8 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 29.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 20.3 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 21.5 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 28.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 22.2 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 29.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 19.7 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 20.9 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 22.2 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 19.1 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 28.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 21.5 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 19.1 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 20.9 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 0 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 23.5 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 20.3 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 19.9 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-75202da2f060a58392b1b2fa 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:48
Sources EV-75202da2f060a58392b1b2fa Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 82304adc0c0474debec9ef9278867cb7ecf4d0778fec62b41efa5a9fabc71150 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset