POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 33items · current page 1–33 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Beryl Solar Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.64 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Unit Capacity (MW AC)1.64 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Aggregated Nameplate Capacity (MW DC)98.4 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Aggregated Nameplate Capacity (MW AC)98.4 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908
Detailed source fields
Original source fieldPublished value or condition
Survey ID1416
Site NameBeryl Solar Farm
Site OwnerFS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust
RegionNSW1
Max Site Capacity (AC)87
Gen Info Unit ID141601
Unit NameBERYLSF
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDBERYLSF1
Dispatch TypeSemi-scheduled
Unit Count60
Unit Capacity (MW DC)1.64
Unit Capacity (MW AC)1.64
Aggregated Nameplate Capacity (MW DC)98.4
Aggregated Nameplate Capacity (MW AC)98.4
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-22T10:15:55
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:107

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:48

Sources EV-fb1404e30cb6392b950728e4
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 45348aa0dbe1f109f4ff12b9cddd73c9ebd492370d592dff1a555b0e3318dfa4

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1416
Site NameBeryl Solar Farm
Site OwnerFS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust
RegionNSW1
Max Site Capacity (AC)87
Gen Info Unit ID141601
Unit NameBERYLSF
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDBERYLSF1
Dispatch TypeSemi-scheduled
Unit Count60
Unit Capacity (MW DC)1.64
Unit Capacity (MW AC)1.64
Aggregated Nameplate Capacity (MW DC)98.4
Aggregated Nameplate Capacity (MW AC)98.4
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-22T10:15:55
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:107

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Beryl Solar Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionNSW1
AEMO Survey ID1416
Gen Info Unit ID141601
Site NameBeryl Solar Farm
DUIDBERYLSF1
Commitment StatusIn Service
Expected Closure Year2049
Survey Latest Update Date2026-05-22T10:15:55
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:48

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:48

Sources EV-fb1404e30cb6392b950728e4
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 45348aa0dbe1f109f4ff12b9cddd73c9ebd492370d592dff1a555b0e3318dfa4

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity82.8 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Beryl Solar Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity77.4 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-fefe78f5ad377a3089021908

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:107

Sources EV-fefe78f5ad377a3089021908
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 583e69c2e0096925d2a4538e0481069f909998ef5e27bdb0156eb2f558e6c7af

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel