POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Tarraleah Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 15 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 Aggregated Nameplate Capacity (MW AC) 15 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9
Detailed source fields Original source field Published value or condition Survey ID 1200 Site Name Tarraleah Site Owner Hydro-Electric Corporation Region TAS1 Max Site Capacity (AC) 94 Gen Info Unit ID 120002 Unit Name Tarraleah:2 Technology Type Hydro Technology Detail Dam DUID TARRALEA Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 15 Aggregated Nameplate Capacity (MW AC) 15 Commitment Status In Service Expected Closure Year 2100 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-23T11:24:48 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1466
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:686
Sources EV-e5a9ca135620b985a4805b94 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 bcb1d19f13c05804e757294f1a3d698f0eec2022702f0c803b50c14df9f6aed1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region TAS1 AEMO Survey ID 1200 Gen Info Unit ID 120002 Site Name Tarraleah DUID TARRALEA Commitment Status In Service Expected Closure Year 2100 Survey Latest Update Date 2026-03-23T11:24:48 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:686
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:686
Sources EV-e5a9ca135620b985a4805b94 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 bcb1d19f13c05804e757294f1a3d698f0eec2022702f0c803b50c14df9f6aed1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1200 Site Name Tarraleah Site Owner Hydro-Electric Corporation Region TAS1 Max Site Capacity (AC) 94 Gen Info Unit ID 120002 Unit Name Tarraleah:2 Technology Type Hydro Technology Detail Dam DUID TARRALEA Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 15 Aggregated Nameplate Capacity (MW AC) 15 Commitment Status In Service Expected Closure Year 2100 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-23T11:24:48 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1466
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 14 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 14 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 12.5 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 14 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-f45aad426469ac14553ed5e9 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1466
Sources EV-f45aad426469ac14553ed5e9 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 3fb8b70640ad2c3f06fa0f349de7b2cdf0d317c7273cd7ed99946603c4a0aba1 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset