Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Quarantine Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 128 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c Aggregated Nameplate Capacity (MW AC) 128 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c
Detailed source fields Original source field Published value or condition Survey ID 1166 Site Name Quarantine Site Owner Origin Energy Power Limited Region SA1 Max Site Capacity (AC) 236 Gen Info Unit ID 116606 Unit Name Quarantine:5 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID QPS5 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 128 Aggregated Nameplate Capacity (MW AC) 128 Commitment Status In Service Expected Closure Year 2049 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-22T15:50:47 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1242
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:570
Sources EV-e487b136354c5bc48912f349 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 bbc0b0771577f7c06e1e30bda7d3dc33a2ec75c408172ced12513546ce5801bd Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1166 Site Name Quarantine Site Owner Origin Energy Power Limited Region SA1 Max Site Capacity (AC) 236 Gen Info Unit ID 116606 Unit Name Quarantine:5 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID QPS5 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 128 Aggregated Nameplate Capacity (MW AC) 128 Commitment Status In Service Expected Closure Year 2049 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-22T15:50:47 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1242
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 1166 Gen Info Unit ID 116606 Site Name Quarantine DUID QPS5 Commitment Status In Service Expected Closure Year 2049 Survey Latest Update Date 2026-05-22T15:50:47 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:570
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:570
Sources EV-e487b136354c5bc48912f349 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 bbc0b0771577f7c06e1e30bda7d3dc33a2ec75c408172ced12513546ce5801bd Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 120 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 114 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 111 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-c889af09d99de8ee3282ea6c 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1242
Sources EV-c889af09d99de8ee3282ea6c Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 8b94a4e8006696c5c03eb7ea1f5281e78c64d0f1b58f93db0b84d2ce7c57a2ca Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset