POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 33items · current page 1–33 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Murray 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)95 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e
Aggregated Nameplate Capacity (MW AC)95 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e
Detailed source fields
Original source fieldPublished value or condition
Survey ID1147
Site NameMurray 1
Site OwnerSnowy Hydro Ltd
RegionVIC1
Max Site Capacity (AC)950
Gen Info Unit ID114705
Unit NameMurray 1:4
Technology TypeHydro
Technology DetailDam
DUIDMURRAY
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)95
Aggregated Nameplate Capacity (MW AC)95
Commitment StatusIn Service
Expected Closure Year2070
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-06-03T12:18:18
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1071

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:498

Sources EV-6eabd964ef8277394e70f397
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 feaeb102c07b2022a5b1c8846a28535b83735ac96ff84d88305cf56bb871689e

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Murray 1

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1147
Site NameMurray 1
Site OwnerSnowy Hydro Ltd
RegionVIC1
Max Site Capacity (AC)950
Gen Info Unit ID114705
Unit NameMurray 1:4
Technology TypeHydro
Technology DetailDam
DUIDMURRAY
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)95
Aggregated Nameplate Capacity (MW AC)95
Commitment StatusIn Service
Expected Closure Year2070
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-06-03T12:18:18
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1071

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Murray 1

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionVIC1
AEMO Survey ID1147
Gen Info Unit ID114705
Site NameMurray 1
DUIDMURRAY
Commitment StatusIn Service
Expected Closure Year2070
Survey Latest Update Date2026-06-03T12:18:18
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:498

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:498

Sources EV-6eabd964ef8277394e70f397
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 feaeb102c07b2022a5b1c8846a28535b83735ac96ff84d88305cf56bb871689e

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity0 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Murray 1

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity95 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-e9d57555a4c1bf86422d3f6e

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1071

Sources EV-e9d57555a4c1bf86422d3f6e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bed7da1c5da08596fdf6ea7aebb945b2bc0be037914a556389fe8373c752999f

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel