POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Mortlake Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 292 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 Aggregated Nameplate Capacity (MW AC) 292 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29
Detailed source fields Original source field Published value or condition Survey ID 1139 Site Name Mortlake Site Owner Origin Energy Power Limited Region VIC1 Max Site Capacity (AC) 584 Gen Info Unit ID 113906 Unit Name Mortlake:2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID MORTLK12 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 292 Aggregated Nameplate Capacity (MW AC) 292 Commitment Status In Service Expected Closure Year 2052 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-30T10:51:52 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1011
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:465
Sources EV-953879a7c5608774d22727f4 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 c095a2972389ec9e94ed597727c75e68b69ef7140e02b4b2a909facbaaf67e6b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1139 Site Name Mortlake Site Owner Origin Energy Power Limited Region VIC1 Max Site Capacity (AC) 584 Gen Info Unit ID 113906 Unit Name Mortlake:2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID MORTLK12 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 292 Aggregated Nameplate Capacity (MW AC) 292 Commitment Status In Service Expected Closure Year 2052 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-30T10:51:52 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:1011
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region VIC1 AEMO Survey ID 1139 Gen Info Unit ID 113906 Site Name Mortlake DUID MORTLK12 Commitment Status In Service Expected Closure Year 2052 Survey Latest Update Date 2026-03-30T10:51:52 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:465
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:465
Sources EV-953879a7c5608774d22727f4 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 c095a2972389ec9e94ed597727c75e68b69ef7140e02b4b2a909facbaaf67e6b Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 266 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 292 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 257 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6f0fe1b55e77c249a39d4a29 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1011
Sources EV-6f0fe1b55e77c249a39d4a29 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 17a7d92ca1cc1c1255f510df7004e5fb7e1ac82caf20b5ab61a1d9c88deddf77 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset