POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 30items · current page 1–30 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 280 MWac Original source column definition · Generation-register unit · Announced Withdrawal As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e Aggregated Nameplate Capacity (MW AC) 280 MWac Original source column definition · Generation-register unit · Announced Withdrawal As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e
Detailed source fields Original source field Published value or condition Survey ID 1077 Site Name Gladstone Site Owner Gladstone Power Station Participants Region QLD1 Max Site Capacity (AC) 1680 Gen Info Unit ID 107704 Unit Name Gladstone:4 Technology Type Coal Technology Detail Black Coal DUID GSTONE4 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 280 Aggregated Nameplate Capacity (MW AC) 280 Commitment Status Announced Withdrawal Expected Closure Year 2029 Closure Date 2029-03-31T00:00:00 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-06T15:01:43 record_semantics participant_reported_generation_information_not_DC_supply Original text Announced Withdrawal source_record_id Generator Information:543
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:250
Sources EV-070ae8df76e3da07e5eb9631 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 03327b0b6f8efb7477d080a7507e4c9d6f68bcd980e9fd1d61d71628e74b95c8 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 1077 Gen Info Unit ID 107704 Site Name Gladstone DUID GSTONE4 Commitment Status Announced Withdrawal Expected Closure Year 2029 Closure Date 2029-03-31T00:00:00 Survey Latest Update Date 2026-05-06T15:01:43 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Announced Withdrawal source_record_id Expected Closure Year:250
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:250
Sources EV-070ae8df76e3da07e5eb9631 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 03327b0b6f8efb7477d080a7507e4c9d6f68bcd980e9fd1d61d71628e74b95c8 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1077 Site Name Gladstone Site Owner Gladstone Power Station Participants Region QLD1 Max Site Capacity (AC) 1680 Gen Info Unit ID 107704 Unit Name Gladstone:4 Technology Type Coal Technology Detail Black Coal DUID GSTONE4 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 280 Aggregated Nameplate Capacity (MW AC) 280 Commitment Status Announced Withdrawal Expected Closure Year 2029 Closure Date 2029-03-31T00:00:00 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-06T15:01:43 record_semantics participant_reported_generation_information_not_DC_supply Original text Announced Withdrawal source_record_id Generator Information:543
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 280 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-a8164c4c5ac4afc400caa72e 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:543
Sources EV-a8164c4c5ac4afc400caa72e Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 45559834ebd5fe2ed1e70f3dadcedbd30951b1a2463353c7f6d7d3de36aec355 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset