Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Braemar 2 Power Station Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 165 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 Aggregated Nameplate Capacity (MW AC) 165 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248
Detailed source fields Original source field Published value or condition Survey ID 1027 Site Name Braemar 2 Power Station Site Owner Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd T/A NewGen Braemar 2 Partnership Region QLD1 Max Site Capacity (AC) 519 Gen Info Unit ID 102702 Unit Name Braemar 2 Power Station:Braemar6 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BRAEMAR6 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 165 Aggregated Nameplate Capacity (MW AC) 165 Commitment Status In Service Expected Closure Year 2049 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-16T10:39:25 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:183
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:82
Sources EV-93f602abf0d86f92cfa1197b Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 347c8df08db00ea4cbd5c339c687b575621b1af9d44d7a977d21052ac0788992 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 1027 Gen Info Unit ID 102702 Site Name Braemar 2 Power Station DUID BRAEMAR6 Commitment Status In Service Expected Closure Year 2049 Survey Latest Update Date 2026-03-16T10:39:25 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:82
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:82
Sources EV-93f602abf0d86f92cfa1197b Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 347c8df08db00ea4cbd5c339c687b575621b1af9d44d7a977d21052ac0788992 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1027 Site Name Braemar 2 Power Station Site Owner Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd T/A NewGen Braemar 2 Partnership Region QLD1 Max Site Capacity (AC) 519 Gen Info Unit ID 102702 Unit Name Braemar 2 Power Station:Braemar6 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BRAEMAR6 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 165 Aggregated Nameplate Capacity (MW AC) 165 Commitment Status In Service Expected Closure Year 2049 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-16T10:39:25 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:183
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 165 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 155 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-b5a497f25aac0f9ee52b4248 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:183
Sources EV-b5a497f25aac0f9ee52b4248 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 e05bccc8a02214df0f0145d47a5c9988df282b9fc4550c7e8602847cbb223305 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset