POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 33items · current page 1–33 · Source records, not unique facilities.

Power assets and projects · AUS · aemo_generation

Berrybank Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)4.2 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace
Aggregated Nameplate Capacity (MW AC)180.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace
Detailed source fields
Original source fieldPublished value or condition
Survey ID1018
Site NameBerrybank Wind Farm
Site OwnerBerrbank Development Pty ltd
RegionVIC1
Max Site Capacity (AC)281.1
Gen Info Unit ID101803
Unit NameBerrybank Wind Farm - Stage 1: Units 1-43
Technology TypeWind
Technology DetailOnshore
DUIDBRYB1WF1
Dispatch TypeSemi-scheduled
Unit Count43
Unit Capacity (MW AC)4.2
Aggregated Nameplate Capacity (MW AC)180.6
Commitment StatusIn Service
Expected Closure Year2051
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-17T13:47:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:104

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:46

Sources EV-1f5478134a71153c3bc13dc7
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 87fd87ecdf6522462c7d9a3a954494dd9ca8da7a15911fd74c30d72e4f645de5

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_closure

Berrybank Wind Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
RegionVIC1
AEMO Survey ID1018
Gen Info Unit ID101803
Site NameBerrybank Wind Farm
DUIDBRYB1WF1
Commitment StatusIn Service
Expected Closure Year2051
Survey Latest Update Date2026-03-17T13:47:13
Publication Date2024-07-24T00:00:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idExpected Closure Year:46

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:46

Sources EV-1f5478134a71153c3bc13dc7
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 87fd87ecdf6522462c7d9a3a954494dd9ca8da7a15911fd74c30d72e4f645de5

Usage terms AEMO general copyright permission subject to exceptions

Source snapshots by date · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Survey ID1018
Site NameBerrybank Wind Farm
Site OwnerBerrbank Development Pty ltd
RegionVIC1
Max Site Capacity (AC)281.1
Gen Info Unit ID101803
Unit NameBerrybank Wind Farm - Stage 1: Units 1-43
Technology TypeWind
Technology DetailOnshore
DUIDBRYB1WF1
Dispatch TypeSemi-scheduled
Unit Count43
Unit Capacity (MW AC)4.2
Aggregated Nameplate Capacity (MW AC)180.6
Commitment StatusIn Service
Expected Closure Year2051
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-17T13:47:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:104

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2031

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2033

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2027

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2026-27

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2035

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2033-34

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2029

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2026

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2031-32

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2027-28

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2035-36

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2032-33

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2028

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2028-29

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2032

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2030

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2029-30

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Typical 2030-31

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Summer Peak 2034-35

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

Period forecasts and observations · AUS · aemo_generation

Berrybank Wind Farm

Generation-register unit · Forecast

Metric or conditionSource valueBasis, scope and stage
Scheduled Capacity175.87 MWNot obtained · Generation-register unit · Forecast
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace

측정·전망기간 Winter 2034

Seasonal generation-capacity forecast; not metered data-center demand.

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel