POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bell Bay Three Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 40 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd Aggregated Nameplate Capacity (MW AC) 40 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd
Detailed source fields Original source field Published value or condition Survey ID 1015 Site Name Bell Bay Three Site Owner AETV Pty Ltd Region TAS1 Max Site Capacity (AC) 147 Gen Info Unit ID 101502 Unit Name Bell Bay Three:2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BBTHREE2 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 40 Aggregated Nameplate Capacity (MW AC) 40 Commitment Status In Service Expected Closure Year 2040 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-03-24T17:55:27 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:89
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:41
Sources EV-7c381a95d733691a05d12f03 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 0f4047b7f18392457b9094bd412a6c1609e06f0c1e77b03a4e635f4fe9e80c54 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1015 Site Name Bell Bay Three Site Owner AETV Pty Ltd Region TAS1 Max Site Capacity (AC) 147 Gen Info Unit ID 101502 Unit Name Bell Bay Three:2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BBTHREE2 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 40 Aggregated Nameplate Capacity (MW AC) 40 Commitment Status In Service Expected Closure Year 2040 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-03-24T17:55:27 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:89
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region TAS1 AEMO Survey ID 1015 Gen Info Unit ID 101502 Site Name Bell Bay Three DUID BBTHREE2 Commitment Status In Service Expected Closure Year 2040 Survey Latest Update Date 2026-03-24T17:55:27 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:41
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:41
Sources EV-7c381a95d733691a05d12f03 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 0f4047b7f18392457b9094bd412a6c1609e06f0c1e77b03a4e635f4fe9e80c54 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 25 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 40 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-7beade66b9a231c9a41b90cd 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:89
Sources EV-7beade66b9a231c9a41b90cd Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset