POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bald Hills Wind Farm Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 2.05 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed Unit Capacity (MW AC) 2.05 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed Aggregated Nameplate Capacity (MW DC) 106.6 MWdc Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed Aggregated Nameplate Capacity (MW AC) 106.6 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed
Detailed source fields Original source field Published value or condition Survey ID 1006 Site Name Bald Hills Wind Farm Site Owner Bald Hills Wind Farm Pty Ltd Region VIC1 Max Site Capacity (AC) 106 Gen Info Unit ID 100601 Unit Name Bald Hills Wind Farm:1-52 Technology Type Wind Technology Detail Onshore DUID BALDHWF1 Dispatch Type Semi-scheduled Unit Count 52 Unit Capacity (MW DC) 2.05 Unit Capacity (MW AC) 2.05 Aggregated Nameplate Capacity (MW DC) 106.6 Aggregated Nameplate Capacity (MW AC) 106.6 Commitment Status In Service Expected Closure Year 2040 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-13T11:23:32 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:43
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:20
Sources EV-0aefa97f74ef4303f6a6235e Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d31e9d2c5f52985ef384c11ec1068914c27f52ad7565f89701e162ad5ae48fc0 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1006 Site Name Bald Hills Wind Farm Site Owner Bald Hills Wind Farm Pty Ltd Region VIC1 Max Site Capacity (AC) 106 Gen Info Unit ID 100601 Unit Name Bald Hills Wind Farm:1-52 Technology Type Wind Technology Detail Onshore DUID BALDHWF1 Dispatch Type Semi-scheduled Unit Count 52 Unit Capacity (MW DC) 2.05 Unit Capacity (MW AC) 2.05 Aggregated Nameplate Capacity (MW DC) 106.6 Aggregated Nameplate Capacity (MW AC) 106.6 Commitment Status In Service Expected Closure Year 2040 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-13T11:23:32 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:43
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region VIC1 AEMO Survey ID 1006 Gen Info Unit ID 100601 Site Name Bald Hills Wind Farm DUID BALDHWF1 Commitment Status In Service Expected Closure Year 2040 Survey Latest Update Date 2026-03-13T11:23:32 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:20
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:20
Sources EV-0aefa97f74ef4303f6a6235e Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 d31e9d2c5f52985ef384c11ec1068914c27f52ad7565f89701e162ad5ae48fc0 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-cf266e9a90fe1f421f7bf5ed 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:43
Sources EV-cf266e9a90fe1f421f7bf5ed Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 78a47ef7d7711fb8aa16dfb3b7707a6ef304d4f5b91ef6aeef13b3c0be6a2287 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset