Balvedavist 162 Battery Storage
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-32d5abecc41b65868d90d00f |
| MW Increase / Decrease | 162 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-32d5abecc41b65868d90d00f |
| Cumulative Total Capacity (MW) | 162 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-32d5abecc41b65868d90d00f |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balvedavist 162 Battery Storage |
| Customer Name | S4N SPITTAL LTD |
| Connection Site | Spittal 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 162.00 |
| Cumulative Total Capacity (MW) | 162.00 |
| MW Effective From | 2030-10-31 |
| Project Status | Awaiting Consents |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005iaJQAQ |
| Project Number | PRO-002024 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:118 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:118
Sources EV-32d5abecc41b65868d90d00fEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 44fc3a80510ce7013b6b4b4ee3bb057226ec4cd77a01249e6f24e55dee74c3f9
Usage terms NESO Open Data Licence